(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
A wide variety of standard and configurable components for factory automation engineers in industries such as automotive, semiconductor, packaging, medical and many more.
A good selection of accessories such as screws, bolts, washers and nuts that you may need for your daily engineering usage.
Browse industrial materials ranging from heat insulating plates, sponges, to metal and plastic materials in different sizes to meet your various applications.
A wide variety of wiring parts for connecting and protecting control and PC parts including Connectors, Cables, Electric Wires, Crimping Terminals and more.
A wide variety of controls and PC parts for electrical engineers including Controls, Powers, PC parts and more.
A wide variety of cutting tools for many uses and work materials including End Mills, Drills, Cutters, Reamers, Turning Tools and more.
A wide variety of tools and supplies used in processing including Machine Tools, Measurement Tools, Grinding and Polishing Supplies and more.
A wide variety of goods used in shipment, material handling and warehouse including Tape supplies, Stretch film, Truck, Shelf, Crane and more.
A large variety of goods for every kind of factories and offices including Protection items, Cleaning supplies, sanitations, office supplies and more.
A large variety of items used in R&D and Clean Room including research Equipment, Laboratory Essentials, Analysis Supplies, Clean Environment-Related Equipment and more.
Choose from thousands of standard stamping die components including Punch & Die, Gas Springs, Guide Components, Coil Springs and many more.
Browse our wide variety of mold components including Ejector Pins, Sleeves, Leader Components, Sprue Bushings and many more.
Browse our injection molding components including Heating Items, Couplers, Hoses and more.
- Rolled Ball Screws - Shaft Ends Configurable - Accuracy Grade C10 from MISUMI.
- The Rolled Ball Screws have a shaft diameter from 8mm to 32mm and are available in eight different lead sizes: 2mm, 4mm,5mm, 6mm, 10mm, 20mm, 25mm and 32mm.
- The accuracy grade option for this product is C10.
- The overall length of the shaft screw can be customized to fit a range of configurations, from 100mm to 2000mm, in 1mm increments.
- The lead twisting direction for this product is right-handed.
- The screw shaft is made of 1055 Carbon steel while the nut is made of SCM420.
Part Number
Configured Part Number is shown.
CAD Data download and 3D preview are not available because the part number has not yet been determined.
Part Number |
---|
FBSSRAA0802-[100-400/1] |
FBSSRAA0804-[100-380/1] |
FBSSRAA1002-[150-585/1] |
FBSSRAA1004-[150-600/1] |
FBSSRAA1010-[150-585/1] |
FBSSRAA1204-[150-800/1] |
FBSSRAA1210-[150-800/1] |
FBSSRAA1405-[150-800/1] |
FBSSRAA1505-[150-1200/1] |
FBSSRAA1510-[200-1200/1] |
FBSSRAA1520-[200-1200/1] |
FBSSRAA2005-[200-2000/1] |
FBSSRAA2010-[250-2000/1] |
FBSSRAA2020-[250-2000/1] |
FBSSRAA2505-[200-2000/1] |
FBSSRAA2510-[300-2000/1] |
FBSSRAA2525-[300-2000/1] |
FBSSRAA2806-[200-2000/1] |
FBSSRAA3210-[300-2000/1] |
FBSSRAA3232-[300-2000/1] |
FBSSRAJ0802-[100-400/1]-F[5-12/1]-P4-S[5-24/1]-V6-U[6-12/1] |
FBSSRAJ0804-[100-380/1]-F[5-12/1]-P4-S[5-24/1]-V6-U[6-12/1] |
FBSSRAJ1002-[150-585/1]-F[5-18/1]-P[4,5,6]-S[5-32/1]-V8-U[8-16/1] |
FBSSRAJ1004-[150-600/1]-F[5-13/1]-P[4,5,6]-S[5-32/1]-V8-U[8-16/1] |
FBSSRAJ1010-[150-585/1]-F[5-13/1]-P[4,5,6]-S[5-32/1]-V8-U[8-16/1] |
FBSSRAJ1204-[150-800/1]-F[5-24/1]-P[4-8/1]-S[5-40/1]-V[8,10]-U[8-20/1] |
FBSSRAJ1210-[150-800/1]-F[5-24/1]-P[4-8/1]-S[5-40/1]-V[8,10]-U[8-20/1] |
FBSSRAJ1405-[150-800/1]-F[5-24/1]-P[4-8/1]-S[5-40/1]-V[8,10]-U[8-20/1] |
FBSSRAJ1505-[150-1200/1]-F[5-30/1]-P[4-10/1]-S[5-48/1]-V[10,12]-U[10-24/1] |
FBSSRAJ1510-[200-1200/1]-F[5-30/1]-P[4-10/1]-S[5-48/1]-V[10,12]-U[10-24/1] |
FBSSRAJ1520-[200-1200/1]-F[5-30/1]-P[4-10/1]-S[5-48/1]-V[10,12]-U[10-24/1] |
FBSSRAJ2005-[200-2000/1]-F[5-39/1]-P[4-13/1]-S[5-60/1]-V[10,12,15]-U[10-30/1] |
FBSSRAJ2010-[250-2000/1]-F[5-39/1]-P[4-13/1]-S[5-60/1]-V[10,12,15]-U[10-30/1] |
FBSSRAJ2020-[250-2000/1]-F[5-39/1]-P[4-13/1]-S[5-60/1]-V[10,12,15]-U[10-30/1] |
FBSSRAJ2505-[200-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1] |
FBSSRAJ2510-[300-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1] |
FBSSRAJ2525-[300-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1] |
FBSSRAJ2806-[200-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1] |
FBSSRAJ3210-[300-2000/1]-F[5-69/1]-P[4-23/1]-S[5-100/1]-V[20,25]-U[20-50/1] |
FBSSRAJ3232-[300-2000/1]-F[5-69/1]-P[4-23/1]-S[5-100/1]-V[20,25]-U[20-50/1] |
FBSSRAK1002-[150-585/1]-F[5-13/1]-P[4,5,6]-S[5-32/1]-V8-U[8-16/1]-C[2-11/1]-KC[0-11/1] |
FBSSRAK1004-[150-600/1]-F[5-13/1]-P[4,5,6]-S[5-32/1]-V8-U[8-16/1]-C[2-11/1]-KC[0-11/1] |
FBSSRAK1010-[150-585/1]-F[5-13/1]-P[4,5,6]-S[5-32/1]-V8-U[8-16/1]-C[2-11/1]-KC[0-11/1] |
FBSSRAK1204-[150-800/1]-F[5-24/1]-P[4-8/1]-S[5-40/1]-V[8,10]-U[8-20/1]-C[2-22/1]-KC[0-22/1] |
FBSSRAK1210-[150-800/1]-F[5-24/1]-P[4-8/1]-S[5-40/1]-V[8,10]-U[8-20/1]-C[2-22/1]-KC[0-22/1] |
FBSSRAK1405-[150-800/1]-F[5-24/1]-P[4-8/1]-S[5-40/1]-V[8,10]-U[8-20/1]-C[2-22/1]-KC[0-22/1] |
FBSSRAK1505-[150-1200/1]-F[5-30/1]-P[4-10/1]-S[5-48/1]-V[10,12]-U[10-24/1]-C[2-28/1]-KC[0-28/1] |
FBSSRAK1510-[200-1200/1]-F[5-30/1]-P[4-10/1]-S[5-48/1]-V[10,12]-U[10-24/1]-C[2-28/1]-KC[0-28/1] |
FBSSRAK1520-[200-1200/1]-F[5-30/1]-P[4-10/1]-S[5-48/1]-V[10,12]-U[10-24/1]-C[2-28/1]-KC[0-28/1] |
FBSSRAK2005-[200-2000/1]-F[5-39/1]-P[4-13/1]-S[5-60/1]-V[10,12,15]-U[10-30/1]-C[2-37/1]-KC[0-37/1] |
FBSSRAK2010-[250-2000/1]-F[5-39/1]-P[4-13/1]-S[5-60/1]-V[10,12,15]-U[10-30/1]-C[2-37/1]-KC[0-37/1] |
FBSSRAK2020-[250-2000/1]-F[5-39/1]-P[4-13/1]-S[5-60/1]-V[10,12,15]-U[10-30/1]-C[2-37/1]-KC[0-37/1] |
FBSSRAK2505-[200-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1]-C[2-52/1]-KC[0-52/1] |
FBSSRAK2510-[300-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1]-C[2-52/1]-KC[0-52/1] |
FBSSRAK2525-[300-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1]-C[2-52/1]-KC[0-52/1] |
FBSSRAK2806-[200-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1]-C[2-52/1]-KC[0-52/1] |
FBSSRAK3210-[300-2000/1]-F[5-69/1]-P[4-23/1]-S[5-100/1]-V[20,25]-U[20-50/1]-C[2-67/1]-KC[0-67/1] |
FBSSRAK3232-[300-2000/1]-F[5-69/1]-P[4-23/1]-S[5-100/1]-V[20,25]-U[20-50/1]-C[2-67/1]-KC[0-67/1] |
FBSSRAM1204-[150-800/1]-F[5-24/1]-P[4-8/1]-S[5-40/1]-V[8,10]-U[8-20/1]-E[4,5,6] |
FBSSRAM1210-[150-800/1]-F[5-24/1]-P[4-8/1]-S[5-40/1]-V[8,10]-U[8-20/1]-E[4,5,6] |
FBSSRAM1405-[150-800/1]-F[5-24/1]-P[4-8/1]-S[5-40/1]-V[8,10]-U[8-20/1]-E[4,5,6] |
FBSSRAM1505-[150-1200/1]-F[5-30/1]-P[4-10/1]-S[5-48/1]-V[10,12]-U[10-24/1]-E[4,5,6,8] |
FBSSRAM1510-[200-1200/1]-F[5-30/1]-P[4-10/1]-S[5-48/1]-V[10,12]-U[10-24/1]-E[4,5,6,8] |
FBSSRAM1520-[200-1200/1]-F[5-30/1]-P[4-10/1]-S[5-48/1]-V[10,12]-U[10-24/1]-E[4,5,6,8] |
FBSSRAM2005-[200-2000/1]-F[5-39/1]-P[4-13/1]-S[5-60/1]-V[10,12,15]-U[10-30/1]-E[4,5,6,8,10] |
FBSSRAM2010-[250-2000/1]-F[5-39/1]-P[4-13/1]-S[5-60/1]-V[10,12,15]-U[10-30/1]-E[4,5,6,8,10] |
FBSSRAM2020-[250-2000/1]-F[5-39/1]-P[4-13/1]-S[5-60/1]-V[10,12,15]-U[10-30/1]-E[4,5,6,8,10] |
FBSSRAM2505-[200-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1]-E[4,5,6,8,10] |
FBSSRAM2510-[300-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1]-E[4,5,6,8,10] |
FBSSRAM2525-[300-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1]-E[4,5,6,8,10] |
FBSSRAM2806-[200-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1]-E[4,5,6,8,10] |
FBSSRAM3210-[300-2000/1]-F[5-69/1]-P[4-23/1]-S[5-100/1]-V[20,25]-U[20-50/1]-E[4,5,6,8,10] |
FBSSRAM3232-[300-2000/1]-F[5-69/1]-P[4-23/1]-S[5-100/1]-V[20,25]-U[20-50/1]-E[4,5,6,8,10] |
FBSSRAN0802-[100-400/1]-F[5-12/1]-P4-S[5-24/1]-V6-U[6-12/1]-SC[5-11/1] |
FBSSRAN0804-[100-380/1]-F[5-12/1]-P4-S[5-24/1]-V6-U[6-12/1]-SC[5-11/1] |
FBSSRAN1002-[150-585/1]-F[5-18/1]-P[4,5,6]-S[5-32/1]-V8-U[8-16/1]-SC[5-12/1] |
FBSSRAN1004-[150-600/1]-F[5-13/1]-P[4,5,6]-S[5-32/1]-V8-U[8-16/1]-SC[5-12/1] |
FBSSRAN1010-[150-585/1]-F[5-13/1]-P[4,5,6]-S[5-32/1]-V8-U[8-16/1]-SC[5-12/1] |
FBSSRAN1204-[150-800/1]-F[5-24/1]-P[4-8/1]-S[5-40/1]-V[8,10]-U[8-20/1]-SC[5-23/1] |
FBSSRAN1210-[150-800/1]-F[5-24/1]-P[4-8/1]-S[5-40/1]-V[8,10]-U[8-20/1]-SC[5-23/1] |
FBSSRAN1405-[150-800/1]-F[5-24/1]-P[4-8/1]-S[5-40/1]-V[8,10]-U[8-20/1]-SC[5-23/1] |
FBSSRAN1505-[150-1200/1]-F[5-30/1]-P[4-10/1]-S[5-48/1]-V[10,12]-U[10-24/1]-SC[5-29/1] |
FBSSRAN1510-[200-1200/1]-F[5-30/1]-P[4-10/1]-S[5-48/1]-V[10,12]-U[10-24/1]-SC[5-29/1] |
FBSSRAN1520-[200-1200/1]-F[5-30/1]-P[4-10/1]-S[5-48/1]-V[10,12]-U[10-24/1]-SC[5-29/1] |
FBSSRAN2005-[200-2000/1]-F[5-39/1]-P[4-13/1]-S[5-60/1]-V[10,12,15]-U[10-30/1]-SC[5-38/1] |
FBSSRAN2010-[250-2000/1]-F[5-39/1]-P[4-13/1]-S[5-60/1]-V[10,12,15]-U[10-30/1]-SC[5-38/1] |
FBSSRAN2020-[250-2000/1]-F[5-39/1]-P[4-13/1]-S[5-60/1]-V[10,12,15]-U[10-30/1]-SC[5-38/1] |
FBSSRAN2505-[200-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1]-SC[5-53/1] |
FBSSRAN2510-[300-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1]-SC[5-53/1] |
FBSSRAN2525-[300-2000/1]-F[5-54/1]-P[4-18/1]-S[5-80/1]-V[15,20]-U[15-40/1]-SC[5-53/1] |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | RoHS | Screw Shaft O.D. (Ø) | Lead (mm) | Axial Play | Number of Circuits (Num. of Rows) x (Num. of Turns) | Shaft Screw Overall Length L (mm) | Basic Load Rating: Dynamic Load (N) | Basic Load Rating: Static Load (N) | Shaft End Shape on Support Side | Shaft End Shape on Fixed Side | Shaft End Length F (mm) | Screw Shaft Surface Treatment | C (mm) | E (mm) | G (mm) | H (mm) | J (mm) | JC (mm) | K (mm) | KC (mm) | N (mm) | Q (mm) | R (mm) | S (mm) | SC (mm) | Shaft Dia. P (φ) | U (mm) | V (mm) | W (mm) | X (mm) | Y (mm) | Z (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | 1 Piece(s) | 8 Day(s) or more | 10 | 8 | 2 | 0.05 or Less | 1 x 3.5 | 100 ~ 400 | 1800 | 3200 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 8 | 4 | 0.05 or Less | 1 x 2.5 | 100 ~ 380 | 1900 | 3100 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 10 | 2 | 0.05 or Less | 1 x 2.5 | 150 ~ 585 | 1700 | 3000 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 10 | 10 | 0.05 or Less | 1 x 1.5 | 150 ~ 585 | 1850 | 3200 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 12 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 800 | 2600 | 5800 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 12 | 10 | [0.10 or Less] 0.10 or Less | 1 x 1.5 | 150 ~ 800 | 2850 | 4950 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 14 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 800 | 4400 | 7300 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 1200 | 5100 | 10500 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 10 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 1200 | 5100 | 10500 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 20 | [0.10 or Less] 0.10 or Less | 2 x 1.5 | 200 ~ 1200 | 5800 | 13300 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6200 | 14700 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 10 | [0.2 or Less] 0.15 or Less | 1 x 2.5 | 250 ~ 2000 | 10600 | 22700 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 20 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 250 ~ 2000 | 6200 | 14700 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6600 | 18700 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 27500 | 76300 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 25 | [0.2 or Less] 0.12 or Less | 1 x 2.5 | 300 ~ 2000 | 9300 | 22700 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 28 | 6 | [0.10 or Less] 0.10 or Less | 2 x 2.5 | 200 ~ 2000 | 12100 | 42300 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 32 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 32800 | 86700 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 32 | 32 | [0.2 or Less] 0.15 or Less | 2 x 1.5 | 300 ~ 2000 | 14600 | 38900 | A (No Shaft End Machining) | A (No Shaft End Machining) | - | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 8 | 2 | 0.05 or Less | 1 x 3.5 | 100 ~ 400 | 1800 | 3200 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 12 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 24 | - | 4 | 6 ~ 12 | 6 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 8 | 4 | 0.05 or Less | 1 x 2.5 | 100 ~ 380 | 1900 | 3100 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 12 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 24 | - | 4 | 6 ~ 12 | 6 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 10 | 2 | 0.05 or Less | 1 x 2.5 | 150 ~ 585 | 1700 | 3000 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 18 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 32 | - | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 13 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 32 | - | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 10 | 10 | 0.05 or Less | 1 x 1.5 | 150 ~ 585 | 1850 | 3200 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 13 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 32 | - | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 12 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 800 | 2600 | 5800 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 24 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 12 | 10 | [0.10 or Less] 0.10 or Less | 1 x 1.5 | 150 ~ 800 | 2850 | 4950 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 24 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 14 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 800 | 4400 | 7300 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 24 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 1200 | 5100 | 10500 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 30 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 10 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 1200 | 5100 | 10500 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 30 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 20 | [0.10 or Less] 0.10 or Less | 2 x 1.5 | 200 ~ 1200 | 5800 | 13300 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 30 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6200 | 14700 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 39 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 10 | [0.2 or Less] 0.15 or Less | 1 x 2.5 | 250 ~ 2000 | 10600 | 22700 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 39 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 20 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 250 ~ 2000 | 6200 | 14700 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 39 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6600 | 18700 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 54 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 27500 | 76300 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 54 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 25 | [0.2 or Less] 0.12 or Less | 1 x 2.5 | 300 ~ 2000 | 9300 | 22700 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 54 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 28 | 6 | [0.10 or Less] 0.10 or Less | 2 x 2.5 | 200 ~ 2000 | 12100 | 42300 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 54 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 32 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 32800 | 86700 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 69 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 100 | - | 4 ~ 23 | 20 ~ 50 | 20 ~ 25 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 32 | 32 | [0.2 or Less] 0.15 or Less | 2 x 1.5 | 300 ~ 2000 | 14600 | 38900 | A (No Shaft End Machining) | J (Double Stepped End Machining) | 5 ~ 69 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 100 | - | 4 ~ 23 | 20 ~ 50 | 20 ~ 25 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 10 | 2 | 0.05 or Less | 1 x 2.5 | 150 ~ 585 | 1700 | 3000 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 13 | Phosphate Conversion Coating | 2 ~ 11 | - | - | - | - | - | - | 0 ~ 11 | - | - | - | 5 ~ 32 | - | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 13 | Phosphate Conversion Coating | 2 ~ 11 | - | - | - | - | - | - | 0 ~ 11 | - | - | - | 5 ~ 32 | - | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 10 | 10 | 0.05 or Less | 1 x 1.5 | 150 ~ 585 | 1850 | 3200 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 13 | Phosphate Conversion Coating | 2 ~ 11 | - | - | - | - | - | - | 0 ~ 11 | - | - | - | 5 ~ 32 | - | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 12 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 800 | 2600 | 5800 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 24 | Phosphate Conversion Coating | 2 ~ 22 | - | - | - | - | - | - | 0 ~ 22 | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 12 | 10 | [0.10 or Less] 0.10 or Less | 1 x 1.5 | 150 ~ 800 | 2850 | 4950 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 24 | Phosphate Conversion Coating | 2 ~ 22 | - | - | - | - | - | - | 0 ~ 22 | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 14 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 800 | 4400 | 7300 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 24 | Phosphate Conversion Coating | 2 ~ 22 | - | - | - | - | - | - | 0 ~ 22 | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 1200 | 5100 | 10500 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 30 | Phosphate Conversion Coating | 2 ~ 28 | - | - | - | - | - | - | 0 ~ 28 | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 10 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 1200 | 5100 | 10500 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 30 | Phosphate Conversion Coating | 2 ~ 28 | - | - | - | - | - | - | 0 ~ 28 | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 20 | [0.10 or Less] 0.10 or Less | 2 x 1.5 | 200 ~ 1200 | 5800 | 13300 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 30 | Phosphate Conversion Coating | 2 ~ 28 | - | - | - | - | - | - | 0 ~ 28 | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6200 | 14700 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 39 | Phosphate Conversion Coating | 2 ~ 37 | - | - | - | - | - | - | 0 ~ 37 | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 10 | [0.2 or Less] 0.15 or Less | 1 x 2.5 | 250 ~ 2000 | 10600 | 22700 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 39 | Phosphate Conversion Coating | 2 ~ 37 | - | - | - | - | - | - | 0 ~ 37 | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 20 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 250 ~ 2000 | 6200 | 14700 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 39 | Phosphate Conversion Coating | 2 ~ 37 | - | - | - | - | - | - | 0 ~ 37 | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6600 | 18700 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 54 | Phosphate Conversion Coating | 2 ~ 52 | - | - | - | - | - | - | 0 ~ 52 | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 27500 | 76300 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 54 | Phosphate Conversion Coating | 2 ~ 52 | - | - | - | - | - | - | 0 ~ 52 | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 25 | [0.2 or Less] 0.12 or Less | 1 x 2.5 | 300 ~ 2000 | 9300 | 22700 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 54 | Phosphate Conversion Coating | 2 ~ 52 | - | - | - | - | - | - | 0 ~ 52 | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 28 | 6 | [0.10 or Less] 0.10 or Less | 2 x 2.5 | 200 ~ 2000 | 12100 | 42300 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 54 | Phosphate Conversion Coating | 2 ~ 52 | - | - | - | - | - | - | 0 ~ 52 | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 32 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 32800 | 86700 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 69 | Phosphate Conversion Coating | 2 ~ 67 | - | - | - | - | - | - | 0 ~ 67 | - | - | - | 5 ~ 100 | - | 4 ~ 23 | 20 ~ 50 | 20 ~ 25 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 32 | 32 | [0.2 or Less] 0.15 or Less | 2 x 1.5 | 300 ~ 2000 | 14600 | 38900 | A (No Shaft End Machining) | K (Double Stepped, Keyway) | 5 ~ 69 | Phosphate Conversion Coating | 2 ~ 67 | - | - | - | - | - | - | 0 ~ 67 | - | - | - | 5 ~ 100 | - | 4 ~ 23 | 20 ~ 50 | 20 ~ 25 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 12 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 800 | 2600 | 5800 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 24 | Phosphate Conversion Coating | - | 4 ~ 6 | - | - | - | - | - | - | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 12 | 10 | [0.10 or Less] 0.10 or Less | 1 x 1.5 | 150 ~ 800 | 2850 | 4950 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 24 | Phosphate Conversion Coating | - | 4 ~ 6 | - | - | - | - | - | - | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 14 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 800 | 4400 | 7300 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 24 | Phosphate Conversion Coating | - | 4 | - | - | - | - | - | - | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 1200 | 5100 | 10500 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 30 | Phosphate Conversion Coating | - | 4 ~ 8 | - | - | - | - | - | - | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 10 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 1200 | 5100 | 10500 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 30 | Phosphate Conversion Coating | - | 4 ~ 8 | - | - | - | - | - | - | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 20 | [0.10 or Less] 0.10 or Less | 2 x 1.5 | 200 ~ 1200 | 5800 | 13300 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 30 | Phosphate Conversion Coating | - | 4 ~ 8 | - | - | - | - | - | - | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6200 | 14700 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 39 | Phosphate Conversion Coating | - | 4 ~ 10 | - | - | - | - | - | - | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 10 | [0.2 or Less] 0.15 or Less | 1 x 2.5 | 250 ~ 2000 | 10600 | 22700 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 39 | Phosphate Conversion Coating | - | 4 ~ 10 | - | - | - | - | - | - | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 20 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 250 ~ 2000 | 6200 | 14700 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 39 | Phosphate Conversion Coating | - | 4 ~ 10 | - | - | - | - | - | - | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6600 | 18700 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 54 | Phosphate Conversion Coating | - | 4 ~ 10 | - | - | - | - | - | - | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 27500 | 76300 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 54 | Phosphate Conversion Coating | - | 4 ~ 10 | - | - | - | - | - | - | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 25 | [0.2 or Less] 0.12 or Less | 1 x 2.5 | 300 ~ 2000 | 9300 | 22700 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 54 | Phosphate Conversion Coating | - | 4 ~ 10 | - | - | - | - | - | - | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 28 | 6 | [0.10 or Less] 0.10 or Less | 2 x 2.5 | 200 ~ 2000 | 12100 | 42300 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 54 | Phosphate Conversion Coating | - | 4 ~ 10 | - | - | - | - | - | - | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 32 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 32800 | 86700 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 69 | Phosphate Conversion Coating | - | 4 ~ 10 | - | - | - | - | - | - | - | - | - | 5 ~ 100 | - | 4 ~ 23 | 20 ~ 50 | 20 ~ 25 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 32 | 32 | [0.2 or Less] 0.15 or Less | 2 x 1.5 | 300 ~ 2000 | 14600 | 38900 | A (No Shaft End Machining) | M (Double Stepped, Tapped Hole on the End) | 5 ~ 69 | Phosphate Conversion Coating | - | 4 ~ 10 | - | - | - | - | - | - | - | - | - | 5 ~ 100 | - | 4 ~ 23 | 20 ~ 50 | 20 ~ 25 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 8 | 2 | 0.05 or Less | 1 x 3.5 | 100 ~ 400 | 1800 | 3200 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 12 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 24 | 5 ~ 11 | 4 | 6 ~ 12 | 6 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 8 | 4 | 0.05 or Less | 1 x 2.5 | 100 ~ 380 | 1900 | 3100 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 12 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 24 | 5 ~ 11 | 4 | 6 ~ 12 | 6 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 10 | 2 | 0.05 or Less | 1 x 2.5 | 150 ~ 585 | 1700 | 3000 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 18 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 32 | 5 ~ 12 | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 13 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 32 | 5 ~ 12 | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 10 | 10 | 0.05 or Less | 1 x 1.5 | 150 ~ 585 | 1850 | 3200 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 13 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 32 | 5 ~ 12 | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 12 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 800 | 2600 | 5800 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 24 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 40 | 5 ~ 23 | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 12 | 10 | [0.10 or Less] 0.10 or Less | 1 x 1.5 | 150 ~ 800 | 2850 | 4950 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 24 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 40 | 5 ~ 23 | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 14 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 800 | 4400 | 7300 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 24 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 40 | 5 ~ 23 | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 1200 | 5100 | 10500 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 30 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 48 | 5 ~ 29 | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 10 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 1200 | 5100 | 10500 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 30 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 48 | 5 ~ 29 | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | 15 | 20 | [0.10 or Less] 0.10 or Less | 2 x 1.5 | 200 ~ 1200 | 5800 | 13300 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 30 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 48 | 5 ~ 29 | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6200 | 14700 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 39 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 60 | 5 ~ 38 | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 10 | [0.2 or Less] 0.15 or Less | 1 x 2.5 | 250 ~ 2000 | 10600 | 22700 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 39 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 60 | 5 ~ 38 | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 20 | 20 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 250 ~ 2000 | 6200 | 14700 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 39 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 60 | 5 ~ 38 | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6600 | 18700 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 54 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 80 | 5 ~ 53 | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 27500 | 76300 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 54 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 80 | 5 ~ 53 | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 Piece(s) | 9 Day(s) or more | 10 | 25 | 25 | [0.2 or Less] 0.12 or Less | 1 x 2.5 | 300 ~ 2000 | 9300 | 22700 | A (No Shaft End Machining) | N (Double Stepped, 1 Set Screw Flat) | 5 ~ 54 | Phosphate Conversion Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 80 | 5 ~ 53 | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - |
Loading...
Type | Rolled | Nut Type | Standard Nut | Flange Shape | Round Shape, 2 Set Screw Flats at both ends |
---|---|---|---|---|---|
Accuracy Grade | C10 | Preload | Not Preloaded | Operating Condition | Standard |
Twisting Direction | Right | Nut Structure | Single | Recirculating Method | Tube Type |
Grease Type | Standard | Nut Size | Standard |
MISUMI
Days to Ship : 6 Day(s) or more
MISUMI
Days to Ship : 6 Day(s) or more
MISUMI
Days to Ship : 4 Day(s) or more
MISUMI
Days to Ship : 6 Day(s) or more
MISUMI
Days to Ship : 4 Day(s) or more
MISUMI
Days to Ship : 4 Day(s) or more
MISUMI
Days to Ship : 4 Day(s) or more
MISUMI
Standard Price : MYR 339.86-
Days to Ship : 1 Day(s) or more
MISUMI
Days to Ship : 4 Day(s) or more
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy