(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 23/2 to 7:00 (MYT) 24/2/2025. We apologize for the inconvenience.
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

Cutter for Pin Point Gate (2-Step Gate), for 2-Step Gate Machining / 2-Flute / Straight Edge

Cutter for Pin Point Gate (2-Step Gate), for 2-Step Gate Machining / 2-Flute / Straight Edge

Move the mouse over the image to zoom

  • Cutter for Pin Point Gate (2-Step Gate), for 2-Step Gate Machining / 2-Flute / Straight Edge
  • Cutter for Pin Point Gate (2-Step Gate), for 2-Step Gate Machining / 2-Flute / Straight Edge
  • Cutter for Pin Point Gate (2-Step Gate), for 2-Step Gate Machining / 2-Flute / Straight Edge

[Features]
·Ideal for machining 2-step gate part of pin point gates
·Base material can be selected from 3 types: carbide, high speed steel powder, high-speed steel and high-speed steel

Part Number

Configured Part Number is shown.

Pinpoint Gate (2-Stage Gate) Cutter, for 2-Stage Gate Machining / 2-Flute, Straight Blade:Related Image
Part Number
C-PGTC1.5-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
C-PGTC1.75-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
C-PGTC2-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
C-PGTC2.5-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
C-PGTC3-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC0.8-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[3,​4,​5,​6]
PGTC0.8-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[3,​4,​5,​6]
PGTC0.8-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[3,​4,​5,​6]
PGTC0.75-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[3,​4,​5,​6]
PGTC0.75-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[3,​4,​5,​6]
PGTC0.75-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[3,​4,​5,​6]
PGTC1-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PGTC1-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PGTC1-65-[30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PGTC1.4-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PGTC1.4-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PGTC1.4-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PGTC1.5-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC1.5-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC1.5-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC1.25-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PGTC1.25-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PGTC1.25-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PGTC1.75-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC1.75-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC1.75-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC2-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC2-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC2-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC2.5-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC2.5-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC2.5-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC3-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC3-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PGTC3-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PM-PGTC0.8-25-[30,​40,​50,​60,​70,​80,​90,​120]-[3,​4,​5,​6]
PM-PGTC0.8-50-[30,​40,​50,​60,​70,​80,​90,​120]-[3,​4,​5,​6]
PM-PGTC0.8-65-[30,​40,​50,​60,​70,​80,​90,​120]-[3,​4,​5,​6]
PM-PGTC0.75-25-[30,​40,​50,​60,​70,​80,​90,​120]-[3,​4,​5,​6]
PM-PGTC0.75-50-[30,​40,​50,​60,​70,​80,​90,​120]-[3,​4,​5,​6]
PM-PGTC0.75-65-[30,​40,​50,​60,​70,​80,​90,​120]-[3,​4,​5,​6]
PM-PGTC1-25-[30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PM-PGTC1-50-[30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PM-PGTC1-65-[30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PM-PGTC1.4-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PM-PGTC1.4-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PM-PGTC1.4-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PM-PGTC1.5-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PM-PGTC1.5-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PM-PGTC1.5-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PM-PGTC1.25-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PM-PGTC1.25-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PM-PGTC1.25-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[2,​3,​4,​5,​6]
PM-PGTC1.75-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PM-PGTC1.75-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PM-PGTC1.75-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PM-PGTC2-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PM-PGTC2-50-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PM-PGTC2-65-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
PM-PGTC2.5-25-[20,​30,​40,​50,​60,​70,​80,​90,​120]-[1,​2,​3,​4,​5,​6]
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipBlade length ℓ
(mm)
Bore Diameter
(mm)
Material Both Corners (θ1)
(°)
Both Corners (θ2)
(°)
Shank diameter d θ2 6°
(mm)
Shank diameter d θ2 5°
(mm)
Shank diameter d θ2 4°
(mm)
Shank diameter d θ2 3°
(mm)
Shank diameter d θ2 2°
(mm)
Shank diameter d θ2 1°
(mm)
Shank diameter D
(mm)

-

1 Piece(s) 6 Day(s) or more 251.5Carbide20 ~ 901 ~ 3------6

-

1 Piece(s) 6 Day(s) or more 251.75Carbide20 ~ 901 ~ 3------6

-

1 Piece(s) 6 Day(s) or more 252Carbide20 ~ 901 ~ 3------6

-

1 Piece(s) 6 Day(s) or more 252.5Carbide20 ~ 901 ~ 3------6

-

1 Piece(s) 6 Day(s) or more 253Carbide20 ~ 901 ~ 3------6

-

1 Piece(s) 6 Day(s) or more 250.8High-Speed Steel20 ~ 12036666---

-

1 Piece(s) 6 Day(s) or more 500.8High-Speed Steel20 ~ 12038666---

-

1 Piece(s) 6 Day(s) or more 650.8High-Speed Steel20 ~ 12038866---

-

1 Piece(s) 6 Day(s) or more 250.75High-Speed Steel20 ~ 12036666---

-

1 Piece(s) 6 Day(s) or more 500.75High-Speed Steel20 ~ 12036666---

-

1 Piece(s) 6 Day(s) or more 650.75High-Speed Steel20 ~ 12038866---

-

1 Piece(s) 6 Day(s) or more 251High-Speed Steel20 ~ 1203666666-

-

1 Piece(s) 6 Day(s) or more 501High-Speed Steel20 ~ 1203866666-

-

1 Piece(s) 6 Day(s) or more 651High-Speed Steel30 ~ 1203886666-

-

1 Piece(s) 6 Day(s) or more 251.4High-Speed Steel20 ~ 1203666666-

-

1 Piece(s) 6 Day(s) or more 501.4High-Speed Steel20 ~ 1203866666-

-

1 Piece(s) 6 Day(s) or more 651.4High-Speed Steel20 ~ 12031086666-

-

1 Piece(s) 6 Day(s) or more 251.5High-Speed Steel20 ~ 1201 ~ 3666666-

-

1 Piece(s) 6 Day(s) or more 501.5High-Speed Steel20 ~ 1201 ~ 3866666-

-

1 Piece(s) 6 Day(s) or more 651.5High-Speed Steel20 ~ 1201 ~ 31088666-

-

1 Piece(s) 6 Day(s) or more 251.25High-Speed Steel20 ~ 1203666666-

-

1 Piece(s) 6 Day(s) or more 501.25High-Speed Steel20 ~ 1203866666-

-

1 Piece(s) 6 Day(s) or more 651.25High-Speed Steel20 ~ 12031086666-

-

1 Piece(s) 6 Day(s) or more 251.75High-Speed Steel20 ~ 1201 ~ 3666666-

-

1 Piece(s) 6 Day(s) or more 501.75High-Speed Steel20 ~ 1201 ~ 3886666-

-

1 Piece(s) 6 Day(s) or more 651.75High-Speed Steel20 ~ 1201 ~ 31088666-

-

1 Piece(s) 6 Day(s) or more 252High-Speed Steel20 ~ 1201 ~ 3666666-

-

1 Piece(s) 6 Day(s) or more 502High-Speed Steel20 ~ 1201 ~ 3886666-

-

1 Piece(s) 6 Day(s) or more 652High-Speed Steel20 ~ 1201 ~ 31088666-

-

1 Piece(s) 6 Day(s) or more 252.5High-Speed Steel20 ~ 1201 ~ 3666666-

-

1 Piece(s) 6 Day(s) or more 502.5High-Speed Steel20 ~ 1201 ~ 3886666-

-

1 Piece(s) 6 Day(s) or more 652.5High-Speed Steel20 ~ 1201 ~ 310108666-

-

1 Piece(s) 6 Day(s) or more 253High-Speed Steel20 ~ 1201 ~ 3666666-

-

1 Piece(s) 6 Day(s) or more 503High-Speed Steel20 ~ 1201 ~ 31088666-

-

1 Piece(s) 6 Day(s) or more 653High-Speed Steel20 ~ 1201 ~ 310108866-

-

1 Piece(s) 6 Day(s) or more 250.8Powder High-Speed Steel30 ~ 9036666---

-

1 Piece(s) 6 Day(s) or more 500.8Powder High-Speed Steel30 ~ 9038666---

-

1 Piece(s) 6 Day(s) or more 650.8Powder High-Speed Steel30 ~ 9038866---

-

1 Piece(s) 6 Day(s) or more 250.75Powder High-Speed Steel30 ~ 9036666---

-

1 Piece(s) 6 Day(s) or more 500.75Powder High-Speed Steel30 ~ 9036666---

-

1 Piece(s) 6 Day(s) or more 650.75Powder High-Speed Steel30 ~ 9038866---

-

1 Piece(s) 6 Day(s) or more 251Powder High-Speed Steel30 ~ 903666666-

-

1 Piece(s) 6 Day(s) or more 501Powder High-Speed Steel30 ~ 903866666-

-

1 Piece(s) 6 Day(s) or more 651Powder High-Speed Steel30 ~ 903886666-

-

1 Piece(s) 6 Day(s) or more 251.4Powder High-Speed Steel20 ~ 903666666-

-

1 Piece(s) 6 Day(s) or more 501.4Powder High-Speed Steel20 ~ 903866666-

-

1 Piece(s) 6 Day(s) or more 651.4Powder High-Speed Steel20 ~ 9031086666-

-

1 Piece(s) 6 Day(s) or more 251.5Powder High-Speed Steel20 ~ 901 ~ 3666666-

-

1 Piece(s) 6 Day(s) or more 501.5Powder High-Speed Steel20 ~ 901 ~ 3866666-

-

1 Piece(s) 6 Day(s) or more 651.5Powder High-Speed Steel20 ~ 901 ~ 31088666-

-

1 Piece(s) 6 Day(s) or more 251.25Powder High-Speed Steel20 ~ 903666666-

-

1 Piece(s) 6 Day(s) or more 501.25Powder High-Speed Steel20 ~ 903866666-

-

1 Piece(s) 6 Day(s) or more 651.25Powder High-Speed Steel20 ~ 9031086666-

-

1 Piece(s) 6 Day(s) or more 251.75Powder High-Speed Steel20 ~ 901 ~ 3666666-

-

1 Piece(s) 6 Day(s) or more 501.75Powder High-Speed Steel20 ~ 901 ~ 3886666-

-

1 Piece(s) 6 Day(s) or more 651.75Powder High-Speed Steel20 ~ 901 ~ 31088666-

-

1 Piece(s) 6 Day(s) or more 252Powder High-Speed Steel20 ~ 901 ~ 3666666-

-

1 Piece(s) 6 Day(s) or more 502Powder High-Speed Steel20 ~ 901 ~ 3886666-

-

1 Piece(s) 6 Day(s) or more 652Powder High-Speed Steel20 ~ 901 ~ 31088666-

-

1 Piece(s) 6 Day(s) or more 252.5Powder High-Speed Steel20 ~ 901 ~ 3666666-
Part Number
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipBlade length ℓ
(mm)
Bore Diameter
(mm)
Material Both Corners (θ1)
(°)
Both Corners (θ2)
(°)
Shank diameter d θ2 6°
(mm)
Shank diameter d θ2 5°
(mm)
Shank diameter d θ2 4°
(mm)
Shank diameter d θ2 3°
(mm)
Shank diameter d θ2 2°
(mm)
Shank diameter d θ2 1°
(mm)
Shank diameter D
(mm)

Loading...

Specifications

Pinpoint Gate (2-Stage Gate) Cutter, for 2-Stage Gate Machining / 2-Flute, Straight Blade:Related Image
 

Model Number Blade Length
Double Angle
θ1
(Selection)
Double Angle
θ2
(Selection)
Overall Length
L
Shank Diameter
d
Caliber
D
C-PGTC
(Carbide)
1.5252
30°
40°

50°
60°
70°
80°
90°
120°
1°




1006
1.75
2
2.5
3

[ ! ]Uncoated, as coating makes accuracy difficult to maintain.

Model Number Blade Length

(Selection)
Double Angle
θ1
(Selection)
Double Angle
θ2
(Selection)
Overall Length
L
Shank Diameter
d
Caliber
D
θ2 1°θ2 2°θ2 3°θ2 4°θ2 5°θ2 6°
PM-PGTC
(Powdered High-Speed Steel)

PGTC
(High-Speed Steel)
0.75253
40°

50°
60°
70°
80°
90°
120°
  1006666
506666
656688
0.825  4°6666
506668
656688
1251°4°666666
50666668
65666688
1.25252

30°

40°

50°

60°

70°

80°

90°

120°
1°666666
50666668
656666810
1.4251°6°666666
50666668
656666810
1.5251°6°666666
50666668
656668810
1.75251°666666
50666688
656668810
2251°666666
50666688
656668810
2.5251°5°666666
50666688
6566681010
3251°666666
506668810
6566881010

[ ! ]Uncoated, as coating makes accuracy difficult to maintain.

Delivery Date

Basic Information

Overall Length L(mm) 100

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)

Not a MISUMI customer yet? Register & enjoy 50% off your 1st order!* (*T&C apply.)

  • 7 Million Products
  • 2,000 Brands
  • Free CAD downloads
  • Quote/order any time