(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
A wide variety of standard and configurable components for factory automation engineers in industries such as automotive, semiconductor, packaging, medical and many more.
A good selection of accessories such as screws, bolts, washers and nuts that you may need for your daily engineering usage.
Browse industrial materials ranging from heat insulating plates, sponges, to metal and plastic materials in different sizes to meet your various applications.
A wide variety of wiring parts for connecting and protecting control and PC parts including Connectors, Cables, Electric Wires, Crimping Terminals and more.
A wide variety of controls and PC parts for electrical engineers including Controls, Powers, PC parts and more.
A wide variety of cutting tools for many uses and work materials including End Mills, Drills, Cutters, Reamers, Turning Tools and more.
A wide variety of tools and supplies used in processing including Machine Tools, Measurement Tools, Grinding and Polishing Supplies and more.
A wide variety of goods used in shipment, material handling and warehouse including Tape supplies, Stretch film, Truck, Shelf, Crane and more.
A large variety of goods for every kind of factories and offices including Protection items, Cleaning supplies, sanitations, office supplies and more.
A large variety of items used in R&D and Clean Room including research Equipment, Laboratory Essentials, Analysis Supplies, Clean Environment-Related Equipment and more.
Choose from thousands of standard stamping die components including Punch & Die, Gas Springs, Guide Components, Coil Springs and many more.
Browse our wide variety of mold components including Ejector Pins, Sleeves, Leader Components, Sprue Bushings and many more.
Browse our injection molding components including Heating Items, Couplers, Hoses and more.
[Features]
· Supports handling with wide range of products including thin, light weight, wide stroke and high precision type, etc.
· This series is under revision of the CAD data.
· Please wait until revision is completed.
Japanese Only
Part Number
Configured Part Number is shown.
Part Number |
---|
BHE-01CS |
BHE-01CS-[D,H,R] |
BHE-01CS-[T2H,T2V,T3H,T3V] |
BHE-01CS-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-01CS-[T2H,T2V,T3H,T3V][3,5] |
BHE-01CS-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-01CS-[D,DE,E] |
BHE-01CS-[D,DE,E]-[D,H,R] |
BHE-01CS-[D,DE,E]-[T2H,T2V,T3H,T3V] |
BHE-01CS-[D,DE,E]-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-01CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5] |
BHE-01CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-03CS |
BHE-03CS-[D,H,R] |
BHE-03CS-[T2H,T2V,T3H,T3V] |
BHE-03CS-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-03CS-[T2H,T2V,T3H,T3V][3,5] |
BHE-03CS-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-03CS-[D,DE,E] |
BHE-03CS-[D,DE,E]-[D,H,R] |
BHE-03CS-[D,DE,E]-[T2H,T2V,T3H,T3V] |
BHE-03CS-[D,DE,E]-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-03CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5] |
BHE-03CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-04CS |
BHE-04CS-[D,H,R] |
BHE-04CS-[T2H,T2V,T3H,T3V] |
BHE-04CS-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-04CS-[T2H,T2V,T3H,T3V][3,5] |
BHE-04CS-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-04CS-[D,DE,E] |
BHE-04CS-[D,DE,E]-[D,H,R] |
BHE-04CS-[D,DE,E]-[T2H,T2V,T3H,T3V] |
BHE-04CS-[D,DE,E]-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-04CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5] |
BHE-04CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-05CS |
BHE-05CS-[D,H,R] |
BHE-05CS-[T2H,T2V,T3H,T3V] |
BHE-05CS-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-05CS-[T2H,T2V,T3H,T3V][3,5] |
BHE-05CS-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-05CS-[D,DE,E] |
BHE-05CS-[D,DE,E]-[D,H,R] |
BHE-05CS-[D,DE,E]-[T2H,T2V,T3H,T3V] |
BHE-05CS-[D,DE,E]-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-05CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5] |
BHE-05CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-06CS |
BHE-06CS-[D,H,R] |
BHE-06CS-[T2H,T2V,T3H,T3V] |
BHE-06CS-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-06CS-[T2H,T2V,T3H,T3V][3,5] |
BHE-06CS-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-06CS-[D,DE,E] |
BHE-06CS-[D,DE,E]-[D,H,R] |
BHE-06CS-[D,DE,E]-[T2H,T2V,T3H,T3V] |
BHE-06CS-[D,DE,E]-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-06CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5] |
BHE-06CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Open Dimension L1 (mm) | Stroke Adjustment Mechanism | Size | Lead Wire Length | Number of Switches | Switch |
---|---|---|---|---|---|---|---|---|---|---|
- | 1 Piece(s) | 21 Day(s) or more | 7 | No | 01CS | 1m | NA | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 7 | No | 01CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 7 | No | 01CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 7 | No | 01CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 7 | No | 01CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 7 | No | 01CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 7 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 01CS | 1m | NA | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 7 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 01CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 7 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 01CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 7 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 01CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 7 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 01CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 7 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 01CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 10 | No | 03CS | 1m | NA | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 10 | No | 03CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 10 | No | 03CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 10 | No | 03CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 10 | No | 03CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 10 | No | 03CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 10 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 03CS | 1m | NA | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 10 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 03CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 10 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 03CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 10 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 03CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 10 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 03CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 10 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 03CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 14 | No | 04CS | 1m | NA | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 14 | No | 04CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 14 | No | 04CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 14 | No | 04CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 14 | No | 04CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 14 | No | 04CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 14 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 04CS | 1m | NA | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 14 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 04CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 14 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 04CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 14 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 04CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 14 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 04CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 14 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 04CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 16 | No | 05CS | 1m | NA | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 16 | No | 05CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 16 | No | 05CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 16 | No | 05CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 16 | No | 05CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 16 | No | 05CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 16 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 05CS | 1m | NA | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 16 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 05CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 16 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 05CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 16 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 05CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 16 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 05CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 16 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 05CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 22 | No | 06CS | 1m | NA | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 22 | No | 06CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 22 | No | 06CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 22 | No | 06CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 22 | No | 06CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 22 | No | 06CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 22 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 06CS | 1m | NA | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 22 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 06CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 21 Day(s) or more | 22 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 06CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 22 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 06CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 22 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 06CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 21 Day(s) or more | 22 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 06CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V |
Loading...
Type | Main Body | Gripping Methods | Inserted Parallel Type / Parallel Type of Opening | Number of Fingers | 2 pcs. |
---|---|---|---|---|---|
Main Body Shape | Square type | Closed Dimension L2(mm) | 0 | Environment, Applications | Standard |
Additional Functions | Bearing support / High accuracy | Operating Pressure Range(MPa) | 0.2::0.7 |
MAKITECH
Days to Ship : 10 Day(s) or more
CKD
Standard Price : MYR 81.57-
Days to Ship : 5 Day(s) or more
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy