(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (MYT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information. 
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

Urethane, / Urethane UP Type (Electro-Galvanized / Stainless Steel)

Urethane, / Urethane UP Type (Electro-Galvanized / Stainless Steel)

[Features]
• Urethane foam with U-bolts for adjusting the piping level.
• UP type is designed to adjust the height of the piping.
• No thermal insulation effect is provided.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10640-0055
A10640-0060
A10640-0074
A10640-0089
A10640-0093
A10640-0106
A10640-0125
A10640-0130
A10640-0144
A10640-0159
A10640-0163
A10640-0178
A10640-0182
A10640-0197
A10640-0200
A10640-0214
A10640-0229
A10640-0233
A10640-0248
A10640-0252
A10640-0267
A10640-0271
A10640-0286
A10640-0303
A10640-0318
A10640-0322
A10640-0337
A10640-0341
A10640-0356
A10640-0375
A10640-0380
A10640-0394
A10640-0407
A10640-0411
A10640-0426
A10640-0445
A10640-0450
A10640-0464
A10640-0479
A10640-0483
A10640-0498
A10640-0515
A10640-0534
A10640-0549
A10640-0604
A10640-0619
A10649-0012
A10649-0027
A10649-0031
A10649-0046
A10649-0065
A10649-0070
A10649-0084
A10649-0099
A10649-0101
A10649-0116
A10649-0135
A10649-0140
A10649-0154
A10649-0169
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Applicable Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)
Heat-Retention Thickness T
(mm)

MYR 39.55

1 Piece(s) 11 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating15A1/221.740

MYR 28.77

1 Piece(s) 7 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.220

MYR 27.75

1 Piece(s) 7 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.225

MYR 20.96

1 Piece(s) 7 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.230

MYR 23.99

1 Piece(s) 7 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.240

MYR 21.18

1 Piece(s) 7 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13420

MYR 21.57

1 Piece(s) 7 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13425

MYR 23.42

1 Piece(s) 7 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13430

MYR 26.74

1 Piece(s) 7 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13440

MYR 22.47

1 Piece(s) 7 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.720

MYR 23.42

1 Piece(s) 7 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.725

MYR 24.21

1 Piece(s) 7 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.730

MYR 29.83

1 Piece(s) 7 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.740

MYR 24.21

1 Piece(s) 7 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.620

MYR 25.28

1 Piece(s) 7 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.625

MYR 26.57

1 Piece(s) 7 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.630

MYR 33.21

1 Piece(s) 7 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.640

MYR 26.07

1 Piece(s) 7 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.520

MYR 27.14

1 Piece(s) 7 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.525

MYR 28.82

1 Piece(s) 7 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.530

MYR 36.75

1 Piece(s) 7 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.540

MYR 31.13

1 Piece(s) 7 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.320

MYR 34.67

1 Piece(s) 7 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.325

MYR 37.30

1 Piece(s) 7 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.330

MYR 40.29

1 Piece(s) 7 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.340

MYR 35.22

1 Piece(s) 7 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.120

MYR 38.70

1 Piece(s) 7 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.125

MYR 40.79

1 Piece(s) 7 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.130

MYR 43.83

1 Piece(s) 7 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.140

MYR 55.06

1 Piece(s) 8 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.150

MYR 42.87

1 Piece(s) 7 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.325

MYR 45.11

1 Piece(s) 7 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.330

MYR 47.53

1 Piece(s) 7 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.340

MYR 58.76

1 Piece(s) 7 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.350

MYR 53.88

1 Piece(s) 7 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.825

MYR 57.70

1 Piece(s) 7 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.830

MYR 69.11

1 Piece(s) 8 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.840

MYR 71.92

1 Piece(s) 7 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.850

MYR 62.20

1 Piece(s) 7 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.225

MYR 65.80

1 Piece(s) 7 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.230

MYR 71.92

1 Piece(s) 7 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.240

MYR 80.57

1 Piece(s) 7 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.250

MYR 88.95

1 Piece(s) 8 Day(s) or more 200~Less than 300Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating200A8216.340

MYR 100.52

1 Piece(s) 7 Day(s) or more 200~Less than 300Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating200A8216.350

MYR 309.73

1 Piece(s) 16 Day(s) or more 300~Less than 400Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating350A14355.640

MYR 338.60

1 Piece(s) 16 Day(s) or more 300~Less than 400Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating350A14355.650

MYR 43.20

1 Piece(s) 11 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.720

MYR 43.77

1 Piece(s) 11 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.725

MYR 45.01

1 Piece(s) 11 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.730

MYR 50.17

1 Piece(s) 11 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.740

MYR 46.02

1 Piece(s) 12 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.220

MYR 46.63

1 Piece(s) 12 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.225

MYR 48.38

1 Piece(s) 12 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.230

MYR 51.64

1 Piece(s) 12 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.240

MYR 51.46

1 Piece(s) 5 Day(s) or more 30~Less than 40[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A13420

MYR 52.47

1 Piece(s) 12 Day(s) or more 30~Less than 40[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A13425

MYR 54.10

1 Piece(s) 12 Day(s) or more 30~Less than 40[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A13430

MYR 58.09

1 Piece(s) 12 Day(s) or more 30~Less than 40[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A13440

MYR 52.98

1 Piece(s) 12 Day(s) or more 40~Less than 50[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.720

MYR 54.28

1 Piece(s) 12 Day(s) or more 40~Less than 50[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.725

Loading...

Basic Information

Type Urethane U-Band Qty.(piece) 1

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)