(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information. 
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

Riser Clamp, Riser Clamp / CL Riser Clamp (Electrogalvanized / Stainless Steel)

Riser Clamp, Riser Clamp / CL Riser Clamp (Electrogalvanized / Stainless Steel)

Dedicated floor band for SGP pipe, stainless steel pipe, surface coated steel pipe, copper pipe, cast iron drainage pipe, and fire resistant dual pipe (FDP),
Floor Band for SGP pipe (vibration proof auxiliary)

[Features]
· A10408 floor band: floor band for SGP pipe, electrogalvanized finish.
· A10423 stainless steel floor band: floor band for stainless steel copper pipe.
· A10410CL floor band: floor band for surface coated steel pipe, electrogalvanized finish.

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10408-0019
A10408-0023
A10408-0038
A10408-0042
A10408-0057
A10408-0061
A10408-0076
A10408-0095
A10408-0108
A10408-0112
A10408-0127
A10408-0131
A10408-0146
A10408-0165
A10410-0017
A10410-0021
A10410-0036
A10410-0055
A10410-0060
A10410-0089
A10410-0093
A10410-0106
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Compatible Pipe Type Material Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

MYR 11.17

1 Piece(s) 9 Day(s) or more 20~Less than 30[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating15A1/221.7

MYR 10.05

1 Piece(s) 6 Day(s) or more 20~Less than 30[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating20A3/427.2

MYR 7.72

1 Piece(s) 6 Day(s) or more 30~Less than 40[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating25A134

MYR 8.17

1 Piece(s) 6 Day(s) or more 40~Less than 50[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating32A1 1/442.7

MYR 8.76

1 Piece(s) 6 Day(s) or more 40~Less than 50[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating40A1 1/248.6

MYR 10.16

1 Piece(s) 6 Day(s) or more 60~Less than 70[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating50A260.5

MYR 22.08

1 Piece(s) 7 Day(s) or more 70~Less than 80[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating65A2 1/276.3

MYR 17.52

1 Piece(s) 6 Day(s) or more 80~Less than 90[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating80A389.1

MYR 19.10

1 Piece(s) 4 Day(s) or more 100~Less than 200[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating100A4114.3

MYR 29.77

1 Piece(s) 7 Day(s) or more 100~Less than 200[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating125A5139.8

MYR 35.79

1 Piece(s) 7 Day(s) or more 100~Less than 200[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating150A6165.2

MYR 111.44

1 Piece(s) 14 Day(s) 200~Less than 300[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating200A8216.3

MYR 140.53

1 Piece(s) 8 Day(s) or more 200~Less than 300[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating250A10267.4

MYR 174.81

1 Piece(s) 11 Day(s) or more 300~Less than 400[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating300A12318.5

MYR 21.57

1 Piece(s) 12 Day(s) or more 20~Less than 30[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating15A-25.7

MYR 22.97

1 Piece(s) 12 Day(s) or more 30~Less than 40[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating20A-31.2

MYR 24.27

1 Piece(s) 12 Day(s) or more 30~Less than 40[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating25A-37.6

MYR 26.01

1 Piece(s) 12 Day(s) or more 40~Less than 50[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating32A-46.3

MYR 27.59

1 Piece(s) 12 Day(s) or more 50~Less than 60[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating40A-52.2

MYR 35.73

1 Piece(s) 12 Day(s) or more 70~Less than 80[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating65A-79.9

MYR 40.39

1 Piece(s) 12 Day(s) or more 90~Less than 100[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating80A-92.7

MYR 42.20

1 Piece(s) 12 Day(s) or more 100~Less than 200[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating100A-118.3

Loading...

  1. 1

Basic Information

Type Floor Band Qty.(piece) 1

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)