(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (MYT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information. 
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

Hanging Piping Bracket with No Assembled Hanging Turnbuckle (Zinc Plating/Stainless/Hot-Dip Galvanizing) (Part Numbers)

Hanging Piping Bracket with No Assembled Hanging Turnbuckle (Zinc Plating/Stainless/Hot-Dip Galvanizing)

Assembly type handing band for SGP and stainless steel pipes (thick pipes)

[Features]
· Assembled hanging band for use with SGP pipes.
· 250A or higher are made with ribless flat steel.
· Zinc electroplating finish

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10141-0017
A10141-0021
A10141-0036
A10141-0055
A10141-0060
A10141-0074
A10141-0089
A10141-0093
A10141-0106
A10141-0125
A10141-0130
A10141-0144
A10141-0159
A10141-0163
A10141-0178
A10141-0182
A10141-0197
A10200-0010
A10200-0024
A10200-0039
A10200-0043
A10200-0058
A10200-0062
A10200-0077
A10200-0081
A10200-0096
A10200-0109
A10200-0113
A10200-0128
A10200-0132
A10200-0147
A10200-0151
A11208-0027
A11208-0070
A11208-0084
A11208-0099
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Applicable Tube Type Surface Treatment Nominal Diameter (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

MYR 2.93

1 Piece(s) 10 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating15A1/221.7

MYR 2.87

1 Piece(s) 10 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.2

MYR 3.06

1 Piece(s) 10 Day(s) or more 30~Less than 40SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A134

MYR 3.36

1 Piece(s) 10 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7

MYR 4.89

1 Piece(s) 12 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6

MYR 7.75

1 Piece(s) 12 Day(s) or more 60~Less than 70SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.5

MYR 11.12

1 Piece(s) 12 Day(s) or more 70~Less than 80SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.3

MYR 13.92

1 Piece(s) 12 Day(s) or more 80~Less than 90SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.1

MYR 26.18

1 Piece(s) 12 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating90A3 1/2101.6

MYR 18.42

1 Piece(s) 12 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.3

MYR 31.35

1 Piece(s) 12 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.8

MYR 44.27

1 Piece(s) 12 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.2

MYR 72.43

1 Piece(s) 10 Day(s) or more 200~Less than 300SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating200A8216.3

MYR 162.33

1 Piece(s) 10 Day(s) or more 200~Less than 300SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating250A10267.4

MYR 196.05

1 Piece(s) 10 Day(s) or more 300~Less than 400SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating300A12318.5

MYR 212.57

1 Piece(s) 10 Day(s) or more 300~Less than 400SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating350A14355.6

MYR 283.42

1 Piece(s) 10 Day(s) or more 400~Less than 500SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating400A16406.4

MYR 15.56

1 Piece(s) 12 Day(s) or more 20~Less than 30[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.7

MYR 14.49

1 Piece(s) 12 Day(s) or more 20~Less than 30[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.2

MYR 15.61

1 Piece(s) 12 Day(s) or more 30~Less than 40[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No25A134

MYR 17.07

1 Piece(s) 7 Day(s) or more 40~Less than 50[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.7

MYR 17.92

1 Piece(s) 12 Day(s) or more 40~Less than 50[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No40A1 1/248.6

MYR 18.93

1 Piece(s) 12 Day(s) or more 60~Less than 70[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No50A260.5

MYR 33.09

1 Piece(s) 12 Day(s) or more 70~Less than 80[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No65A2 1/276.3

MYR 35.90

1 Piece(s) 12 Day(s) or more 80~Less than 90[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No80A389.1

MYR 43.15

1 Piece(s) 12 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.3

MYR 87.04

1 Piece(s) 12 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.8

MYR 119.35

1 Piece(s) 12 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.2

MYR 192.56

1 Piece(s) 12 Day(s) or more 200~Less than 300[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No200A8216.3

MYR 337.14

1 Piece(s) 12 Day(s) or more 200~Less than 300[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No250A10267.4

MYR 403.83

1 Piece(s) 12 Day(s) or more 300~Less than 400[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No300A12318.5

MYR 43.15

1 Piece(s) 12 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No90A3 1/2101.6

MYR 15.84

1 Piece(s) 17 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)20A3/427.2

MYR 23.14

1 Piece(s) 17 Day(s) or more 60~Less than 70SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)50A260.5

MYR 36.46

1 Piece(s) 13 Day(s) or more 70~Less than 80SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)65A2 1/276.3

MYR 41.06

1 Piece(s) 13 Day(s) or more 80~Less than 90SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)80A389.1

Loading...

  1. 1

Basic Information

Type Hanging Band Qty.(piece) 1

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)