(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (MYT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information. 
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

Vertical Pipe Fitting Assembly-Type Standing Band (Electrogalvanized/Stainless Steel/Hot Dip)

Vertical Pipe Fitting Assembly-Type Standing Band (Electrogalvanized/Stainless Steel/Hot Dip)

Assembly-type Standing Band for SGP Pipe and Stainless Steel (Thick) Pipe

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10324-0017
A10324-0021
A10324-0036
A10324-0055
A10324-0060
A10324-0074
A10324-0089
A10324-0093
A10324-0106
A10324-0125
A10324-0130
A10324-0144
A10324-0159
A10324-0163
A10324-0178
A10324-0182
A10324-0197
A10350-0017
A10350-0021
A10350-0036
A10350-0055
A10350-0060
A10350-0074
A10350-0089
A10350-0093
A10350-0106
A10350-0125
A10350-0130
A10350-0144
A10350-0159
A10350-0163
A10350-0178
A11212-0015
A11212-0020
A11212-0034
A11212-0049
A11212-0053
A11212-0068
A11212-0072
A11212-0087
A11212-0091
A11212-0104
A11212-0119
A11212-0123
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Compatible Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

MYR 2.51

1 Piece(s) 5 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating15A1/221.7

MYR 2.63

1 Piece(s) 5 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating20A3/427.2

MYR 2.91

1 Piece(s) 5 Day(s) or more 30~Less than 40[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating25A134

MYR 3.13

1 Piece(s) 11 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7

MYR 3.46

1 Piece(s) 5 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6

MYR 3.72

1 Piece(s) 5 Day(s) or more 60~Less than 70[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating50A260.5

MYR 6.07

1 Piece(s) 11 Day(s) or more 70~Less than 80[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.3

MYR 7.19

1 Piece(s) 5 Day(s) or more 80~Less than 90[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating80A389.1

MYR 15.16

1 Piece(s) 5 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating90A3 1/2101.6

MYR 8.31

1 Piece(s) 5 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating100A4114.3

MYR 14.49

1 Piece(s) 11 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating125A5139.8

MYR 16.18

1 Piece(s) 11 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating150A6165.2

MYR 57.58

1 Piece(s) 12 Day(s) or more 200~Less than 300[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating200A8216.3

MYR 78.82

1 Piece(s) 12 Day(s) or more 200~Less than 300[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating250A10267.4

MYR 263.47

1 Piece(s) 12 Day(s) or more 300~Less than 400[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating300A12318.5

MYR 227.34

1 Piece(s) 12 Day(s) or more 300~Less than 400[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating350A14355.6

MYR 286.34

1 Piece(s) 17 Day(s) or more 400~Less than 500[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating400A16406.4

MYR 8.87

1 Piece(s) 5 Day(s) or more 20~Less than 30[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.7

MYR 9.44

1 Piece(s) 12 Day(s) or more 20~Less than 30[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.2

MYR 9.99

1 Piece(s) 5 Day(s) or more 30~Less than 40[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A134

MYR 11.68

1 Piece(s) 5 Day(s) or more 40~Less than 50[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.7

MYR 12.25

1 Piece(s) 5 Day(s) or more 40~Less than 50[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No40A1 1/248.6

MYR 13.37

1 Piece(s) 5 Day(s) or more 60~Less than 70[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No50A260.5

MYR 24.05

1 Piece(s) 5 Day(s) or more 70~Less than 80[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No65A2 1/276.3

MYR 25.72

1 Piece(s) 11 Day(s) or more 80~Less than 90[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No80A389.1

MYR 28.04

1 Piece(s) 5 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.3

MYR 78.05

1 Piece(s) 12 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.8

MYR 111.76

1 Piece(s) 12 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.2

MYR 561.28

1 Piece(s) 10 Day(s) or more 200~Less than 300[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No200A8216.3

MYR 620.50

1 Piece(s) 10 Day(s) or more 200~Less than 300[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No250A10267.4

MYR 715.47

1 Piece(s) 10 Day(s) or more 300~Less than 400[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No300A12318.5

MYR 57.70

1 Piece(s) 5 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No90A3 1/2101.6

MYR 15.89

1 Piece(s) 10 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)15A1/221.7

MYR 17.07

1 Piece(s) 10 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)20A3/427.2

MYR 19.21

1 Piece(s) 10 Day(s) or more 30~Less than 40[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)25A134

MYR 22.74

1 Piece(s) 14 Day(s) 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)32A1 1/442.7

MYR 25.72

1 Piece(s) 10 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)40A1 1/248.6

MYR 28.32

1 Piece(s) 10 Day(s) or more 60~Less than 70[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)50A260.5

MYR 38.26

1 Piece(s) 10 Day(s) or more 70~Less than 80[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)65A2 1/276.3

MYR 40.84

1 Piece(s) 10 Day(s) or more 80~Less than 90[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)80A389.1

MYR 51.01

1 Piece(s) 10 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)100A4114.3

MYR 94.79

1 Piece(s) 10 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)125A5139.8

MYR 100.57

1 Piece(s) 10 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)150A6165.2

MYR 115.75

1 Piece(s) 12 Day(s) or more 200~Less than 300[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)200A8216.3

Loading...

  1. 1

Basic Information

Type Vertical band Qty.(piece) 1

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)