(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (MYT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information. 
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

Vertical Pipe Fitting Standing Band (Electrogalvanized/Stainless Steel/Hot Dip)

Vertical Pipe Fitting Standing Band (Electrogalvanized/Stainless Steel/Hot Dip)

Hinge-type Standing Band for SGP Pipe and Stainless Steel (Thick) Pipe

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10323-0010
A10323-0024
A10323-0039
A10323-0043
A10323-0058
A10323-0062
A10323-0077
A10323-0081
A10323-0096
A10323-0109
A10323-0113
A10323-0128
A10323-0132
A10323-0147
A10323-0151
A10323-0166
A10323-0185
A10323-0190
A10323-0217
A10323-0221
A10323-0325
A10349-0016
A10349-0035
A10349-0040
A10349-0054
A10349-0069
A10349-0073
A10349-0088
A10349-0092
A10349-0105
A10349-0110
A10349-0124
A10349-0139
A10349-0143
A10349-0158
A10349-0162
A10363-0015
A10363-0020
A10363-0034
A10363-0049
A10363-0053
A10363-0068
A10363-0072
A10363-0087
A10363-0091
A10363-0104
A10363-0119
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Compatible Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

MYR 6.45

1 Piece(s) 5 Day(s) or more 10~Less than 20[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating10A3/817.3

MYR 3.54

1 Piece(s) 5 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating15A1/221.7

MYR 3.08

1 Piece(s) 5 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating20A3/427.2

MYR 3.76

1 Piece(s) 5 Day(s) or more 30~Less than 40[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating25A134

MYR 4.21

1 Piece(s) 5 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7

MYR 4.38

1 Piece(s) 5 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6

MYR 5.33

1 Piece(s) 9 Day(s) or more 60~Less than 70[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating50A260.5

MYR 6.62

1 Piece(s) 5 Day(s) or more 70~Less than 80[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.3

MYR 7.19

1 Piece(s) 5 Day(s) or more 80~Less than 90[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating80A389.1

MYR 15.89

1 Piece(s) 5 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating90A3 1/2101.6

MYR 8.31

1 Piece(s) 5 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating100A4114.3

MYR 27.53

1 Piece(s) 5 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating125A5139.8

MYR 18.99

1 Piece(s) 7 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating150A6165.2

MYR 36.91

1 Piece(s) 8 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating175A7190.7

MYR 66.80

1 Piece(s) 7 Day(s) or more 200~Less than 300[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating200A8216.3

MYR 139.85

1 Piece(s) 11 Day(s) or more 200~Less than 300[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating250A10267.4

MYR 252.24

1 Piece(s) 8 Day(s) or more 300~Less than 400[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating300A12318.5

MYR 215.60

1 Piece(s) 10 Day(s) or more 300~Less than 400[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating350A14355.6

MYR 7.53

1 Piece(s) 5 Day(s) or more 30~Less than 40[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc PlatingVP25V-2532

MYR 8.43

1 Piece(s) 8 Day(s) or more 30~Less than 40[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc PlatingVP30V-3038

MYR 7.53

1 Piece(s) 8 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc PlatingVP20V-2026

MYR 25.72

1 Piece(s) 5 Day(s) or more 20~Less than 30[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.7

MYR 27.98

1 Piece(s) 5 Day(s) or more 20~Less than 30[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.2

MYR 29.67

1 Piece(s) 5 Day(s) or more 30~Less than 40[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A134

MYR 33.59

1 Piece(s) 5 Day(s) or more 40~Less than 50[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.7

MYR 36.97

1 Piece(s) 5 Day(s) or more 40~Less than 50[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No40A1 1/248.6

MYR 42.02

1 Piece(s) 5 Day(s) or more 60~Less than 70[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No50A260.5

MYR 50.46

1 Piece(s) 7 Day(s) or more 70~Less than 80[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No65A2 1/276.3

MYR 51.58

1 Piece(s) 5 Day(s) or more 80~Less than 90[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No80A389.1

MYR 28.71

1 Piece(s) 5 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No90A3 1/2101.6

MYR 53.27

1 Piece(s) 5 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.3

MYR 156.70

1 Piece(s) 7 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.8

MYR 179.18

1 Piece(s) 9 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.2

MYR 132.77

1 Piece(s) 8 Day(s) or more 200~Less than 300[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No200A8216.3

MYR 187.11

1 Piece(s) 12 Day(s) or more 200~Less than 300[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No250A10267.4

MYR 513.18

1 Piece(s) 12 Day(s) or more 300~Less than 400[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No300A12318.5

MYR 14.49

1 Piece(s) 5 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)15A1/221.7

MYR 15.51

1 Piece(s) 7 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)20A3/427.2

MYR 17.52

1 Piece(s) 7 Day(s) or more 30~Less than 40[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)25A134

MYR 16.34

1 Piece(s) 6 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)32A1 1/442.7

MYR 23.42

1 Piece(s) 7 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)40A1 1/248.6

MYR 25.72

1 Piece(s) 7 Day(s) or more 60~Less than 70[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)50A260.5

MYR 28.59

1 Piece(s) 7 Day(s) or more 70~Less than 80[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)65A2 1/276.3

MYR 38.26

1 Piece(s) 5 Day(s) or more 80~Less than 90[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)80A389.1

MYR 51.01

1 Piece(s) 5 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)100A4114.3

MYR 86.53

1 Piece(s) 10 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)125A5139.8

MYR 93.94

1 Piece(s) 10 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)150A6165.2

Loading...

  1. 1

Basic Information

Type Vertical band Qty.(piece) 1

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)