(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Please note that some of the items may take longer lead time to ship due to Japan New Year holidays (29-Dec-2024 to 5-Jan-2025). Early order placement is recommended. We apologize for the inconvenience caused and appreciate your kind understanding. [Details]
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

LA Coupling, LA, Socket S

LA Coupling, LA, Socket S

The LA coupling series consists of fittings with rubber packing press-fitted into the pipe to form a seal.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
LA-S-1/2B-N-C
LA-S-1/2B-N-W
LA-S-1B-N-C
LA-S-1B-N-W
LA-S-2B-N-C
LA-S-2B-N-W
LA-S-3/4B-N-C
LA-S-3/4B-N-W
LA-S-3/8B-N-C
LA-S-3/8B-N-W
LA-S-3B-N-C
LA-S-3B-N-W
LA-S-11/2B-N-C
LA-S-11/2B-N-W
LA-S-11/4B-N-C
LA-S-11/4B-N-W
LA-S-21/2B-N-C
LA-S-21/2B-N-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal A 1 Nominal B 1 Material of Applicable Pipe Applicable Pipe O.D. 1
(mm)
Surface Treatment Operating Temperature Range
(°C)

MYR 54.80

1 Piece(s) 11 Day(s) or more 151/2Steel pipe / PVC Pipe21.7Commercial Coated Article (Epoxy Resin) (End-C)-10~40

MYR 41.30

1 Piece(s) 7 Day(s) or more 151/2Steel pipe / PVC Pipe21.7White Products (Zinc Plated)(The End-W)-10~60

MYR 94.72

1 Piece(s) 11 Day(s) or more 251Steel pipe34Commercial Coated Article (Epoxy Resin) (End-C)-10~40

MYR 71.58

1 Piece(s) 5 Day(s) or more 251Steel pipe34White Products (Zinc Plated)(The End-W)-10~60

MYR 197.27

1 Piece(s) 11 Day(s) or more 502Steel pipe / PVC Pipe60.5Commercial Coated Article (Epoxy Resin) (End-C)-10~40

MYR 144.42

1 Piece(s) 5 Day(s) or more 502Steel pipe / PVC Pipe60.5White Products (Zinc Plated)(The End-W)-10~60

MYR 70.59

1 Piece(s) 11 Day(s) or more 203/4Steel pipe / PVC Pipe27.2Commercial Coated Article (Epoxy Resin) (End-C)-10~40

MYR 53.94

1 Piece(s) 5 Day(s) or more 203/4Steel pipe / PVC Pipe27.2White Products (Zinc Plated)(The End-W)-10~60

MYR 44.08

1 Piece(s) 11 Day(s) or more 103/8Steel pipe / PVC Pipe17.3Commercial Coated Article (Epoxy Resin) (End-C)-10~40

MYR 45.56

1 Piece(s) 5 Day(s) or more 103/8Steel pipe / PVC Pipe17.3White Products (Zinc Plated)(The End-W)-10~60

MYR 451.66

1 Piece(s) 11 Day(s) or more 803Steel pipe / PVC Pipe89.10Commercial Coated Article (Epoxy Resin) (End-C)-10~40

MYR 421.53

1 Piece(s) 7 Day(s) or more 803Steel pipe / PVC Pipe89.10White Products (Zinc Plated)(The End-W)-10~60

MYR 143.92

1 Piece(s) 11 Day(s) or more 401 1/2Steel pipe / PVC Pipe48.6Commercial Coated Article (Epoxy Resin) (End-C)-10~40

MYR 105.36

1 Piece(s) 7 Day(s) or more 401 1/2Steel pipe / PVC Pipe48.6White Products (Zinc Plated)(The End-W)-10~60

MYR 117.93

1 Piece(s) 11 Day(s) or more 321 1/4Steel pipe42.7Commercial Coated Article (Epoxy Resin) (End-C)-10~40

MYR 87.37

1 Piece(s) 5 Day(s) or more 321 1/4Steel pipe42.7White Products (Zinc Plated)(The End-W)-10~60

MYR 352.32

1 Piece(s) 11 Day(s) or more 652 1/2Steel pipe / PVC Pipe76.30Commercial Coated Article (Epoxy Resin) (End-C)-10~40

MYR 319.83

1 Piece(s) 7 Day(s) or more 652 1/2Steel pipe / PVC Pipe76.30White Products (Zinc Plated)(The End-W)-10~60

Loading...

  1. 1

Basic Information

Type Fitting Material Black heart malleable cast iron Applicable Pipe Type Steel pipe (general)
Applicable Fluid Water / Air / Gas / Chemical / Oil Connection Type Pipe⇔Pipe, same diameters, plug-in type Connection Shape Straight Pipe⇔Screw(Union/Socket/Reducer.etc)
Fitting type Mechanical Joint Applicable Tube Size Type Steel pipe JIS size Max. Operating Pressure(MPa) 1
Divisions of Max. Operating Pressure(MPa) 1.0Mpa or Less Rubber Gasket Material NBR

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)