(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information. 
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

Floor Pass-Through Pipe Fixture, Floor Band for Fire-Resistant Double-Layer Pipe

Floor Pass-Through Pipe Fixture, Floor Band for Fire-Resistant Double-Layer Pipe

[Features]
· Please inquire as there are cases where the pipe diameters do not match, depending on the manufacturer.
· N-010640, a floor band for stainless steel fire-resistant double layer pipe, can also be fabricated.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

N-010604-50A

 
Part Number
N-010604-50A
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain Applicable Tube O.D.
(mm)
Nominal pipe diameter Compatible Diameter of Pipes (A)
(mm)

MYR 37.08

1 Piece(s) 9 Day(s) or more 70~Less than 8050A76.0

Loading...

  1. 1

Basic Information

Type Floor Through Brackets Applicable Tube Type Fire Resistant Dual Pipes Material Steel
Surface Treatment Zinc Plating

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)