(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 15/12/2024 to 6:00 (MYT) 16/12/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information. 
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

Chain Flex CF211- Twisted Pair Cable, with Shield (Part Numbers)

Chain Flex CF211- Twisted Pair Cable, with Shield

Features
● Supports high loads
● PVC jacketing
● Oil resistant
● Flame retardant

Application
● Intended for indoor use, but may be used outdoors in environments with temperatures of 5°C or more
● Particularly suited to free-span travel and sliding travel (maximum length 100 m)
● Ideal for automated warehouse management and delivery systems, machine tools, packaging machinery, material handling equipment, and indoor cranes, etc.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
CF211.02.02.02-0.25SQ-(2X2)-81
CF211.02.02.02-0.25SQ-(2X2)-82
CF211.02.02.02-0.25SQ-(2X2)-83
CF211.02.02.02-0.25SQ-(2X2)-84
CF211.02.02.02-0.25SQ-(2X2)-85
CF211.02.02.02-0.25SQ-(2X2)-86
CF211.02.02.02-0.25SQ-(2X2)-87
CF211.02.02.02-0.25SQ-(2X2)-88
CF211.02.02.02-0.25SQ-(2X2)-89
CF211.02.02.02-0.25SQ-(2X2)-90
CF211.02.02.02-0.25SQ-(2X2)-91
CF211.02.02.02-0.25SQ-(2X2)-92
CF211.02.02.02-0.25SQ-(2X2)-93
CF211.02.02.02-0.25SQ-(2X2)-94
CF211.02.02.02-0.25SQ-(2X2)-95
CF211.02.02.02-0.25SQ-(2X2)-96
CF211.02.02.02-0.25SQ-(2X2)-97
CF211.02.02.02-0.25SQ-(2X2)-98
CF211.02.02.02-0.25SQ-(2X2)-99
CF211.02.02.02-0.25SQ-(2X2)-100
CF211.02.03.02-0.25SQ-(3X2)-1
CF211.02.03.02-0.25SQ-(3X2)-2
CF211.02.03.02-0.25SQ-(3X2)-3
CF211.02.03.02-0.25SQ-(3X2)-4
CF211.02.03.02-0.25SQ-(3X2)-5
CF211.02.03.02-0.25SQ-(3X2)-6
CF211.02.03.02-0.25SQ-(3X2)-7
CF211.02.03.02-0.25SQ-(3X2)-8
CF211.02.03.02-0.25SQ-(3X2)-9
CF211.02.03.02-0.25SQ-(3X2)-10
CF211.02.03.02-0.25SQ-(3X2)-11
CF211.02.03.02-0.25SQ-(3X2)-12
CF211.02.03.02-0.25SQ-(3X2)-13
CF211.02.03.02-0.25SQ-(3X2)-14
CF211.02.03.02-0.25SQ-(3X2)-15
CF211.02.03.02-0.25SQ-(3X2)-16
CF211.02.03.02-0.25SQ-(3X2)-17
CF211.02.03.02-0.25SQ-(3X2)-18
CF211.02.03.02-0.25SQ-(3X2)-19
CF211.02.03.02-0.25SQ-(3X2)-20
CF211.02.03.02-0.25SQ-(3X2)-21
CF211.02.03.02-0.25SQ-(3X2)-22
CF211.02.03.02-0.25SQ-(3X2)-23
CF211.02.03.02-0.25SQ-(3X2)-24
CF211.02.03.02-0.25SQ-(3X2)-25
CF211.02.03.02-0.25SQ-(3X2)-26
CF211.02.03.02-0.25SQ-(3X2)-27
CF211.02.03.02-0.25SQ-(3X2)-28
CF211.02.03.02-0.25SQ-(3X2)-29
CF211.02.03.02-0.25SQ-(3X2)-30
CF211.02.03.02-0.25SQ-(3X2)-31
CF211.02.03.02-0.25SQ-(3X2)-32
CF211.02.03.02-0.25SQ-(3X2)-33
CF211.02.03.02-0.25SQ-(3X2)-34
CF211.02.03.02-0.25SQ-(3X2)-35
CF211.02.03.02-0.25SQ-(3X2)-36
CF211.02.03.02-0.25SQ-(3X2)-37
CF211.02.03.02-0.25SQ-(3X2)-38
CF211.02.03.02-0.25SQ-(3X2)-39
CF211.02.03.02-0.25SQ-(3X2)-40
CF211.02.03.02-0.25SQ-(3X2)-41
CF211.02.03.02-0.25SQ-(3X2)-42
CF211.02.03.02-0.25SQ-(3X2)-43
CF211.02.03.02-0.25SQ-(3X2)-44
CF211.02.03.02-0.25SQ-(3X2)-45
CF211.02.03.02-0.25SQ-(3X2)-46
CF211.02.03.02-0.25SQ-(3X2)-47
CF211.02.03.02-0.25SQ-(3X2)-48
CF211.02.03.02-0.25SQ-(3X2)-49
CF211.02.03.02-0.25SQ-(3X2)-50
CF211.02.03.02-0.25SQ-(3X2)-51
CF211.02.03.02-0.25SQ-(3X2)-52
CF211.02.03.02-0.25SQ-(3X2)-53
CF211.02.03.02-0.25SQ-(3X2)-54
CF211.02.03.02-0.25SQ-(3X2)-55
CF211.02.03.02-0.25SQ-(3X2)-56
CF211.02.03.02-0.25SQ-(3X2)-57
CF211.02.03.02-0.25SQ-(3X2)-58
CF211.02.03.02-0.25SQ-(3X2)-59
CF211.02.03.02-0.25SQ-(3X2)-60
CF211.02.03.02-0.25SQ-(3X2)-61
CF211.02.03.02-0.25SQ-(3X2)-62
CF211.02.03.02-0.25SQ-(3X2)-63
CF211.02.03.02-0.25SQ-(3X2)-64
CF211.02.03.02-0.25SQ-(3X2)-65
CF211.02.03.02-0.25SQ-(3X2)-66
CF211.02.03.02-0.25SQ-(3X2)-67
CF211.02.03.02-0.25SQ-(3X2)-68
CF211.02.03.02-0.25SQ-(3X2)-69
CF211.02.03.02-0.25SQ-(3X2)-70
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipRoHSOverall Length
(m)
Conductor Cross Section
(mm2)
Number Of Cores
(Core)
Logarithm Finished outer diameter
(mm)
Minimum bending radius while running
(mm)
Minimum bending radius when fixed
(mm)
Conductor resistance
(Ω/km)
Reference allowable current value (30°C)
(A)
Note 1

MYR 2,608.50

1 Piece(s) 6 Day(s) or more 10810.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 2,640.51

1 Piece(s) 6 Day(s) or more 10820.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 2,672.53

1 Piece(s) 6 Day(s) or more 10830.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 2,704.56

1 Piece(s) 6 Day(s) or more 10840.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 2,736.57

1 Piece(s) 6 Day(s) or more 10850.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 2,768.60

1 Piece(s) 6 Day(s) or more 10860.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 2,800.61

1 Piece(s) 6 Day(s) or more 10870.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 2,832.64

1 Piece(s) 6 Day(s) or more 10880.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 2,864.66

1 Piece(s) 6 Day(s) or more 10890.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 2,896.68

1 Piece(s) 6 Day(s) or more 10900.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 2,928.70

1 Piece(s) 6 Day(s) or more 10910.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 2,960.71

1 Piece(s) 6 Day(s) or more 10920.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 2,992.74

1 Piece(s) 6 Day(s) or more 10930.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 3,024.76

1 Piece(s) 6 Day(s) or more 10940.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 3,056.78

1 Piece(s) 6 Day(s) or more 10950.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 3,088.80

1 Piece(s) 6 Day(s) or more 10960.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 3,120.82

1 Piece(s) 6 Day(s) or more 10970.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 3,152.84

1 Piece(s) 6 Day(s) or more 10980.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 3,184.87

1 Piece(s) 6 Day(s) or more 10990.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 3,216.88

1 Piece(s) 6 Day(s) or more 101000.2542P64530795Designed as four-core cut twist. Rated voltage: Uo/U (V) Uo= voltage between conductor and ground, U = voltage between each conductor

MYR 57.01

1 Piece(s) 6 Day(s) or more 1010.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 99.20

1 Piece(s) 6 Day(s) or more 1020.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 141.39

1 Piece(s) 6 Day(s) or more 1030.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 183.58

1 Piece(s) 6 Day(s) or more 1040.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 225.77

1 Piece(s) 6 Day(s) or more 1050.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 267.95

1 Piece(s) 6 Day(s) or more 1060.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 310.15

1 Piece(s) 6 Day(s) or more 1070.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 352.34

1 Piece(s) 6 Day(s) or more 1080.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 394.52

1 Piece(s) 6 Day(s) or more 1090.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 436.72

1 Piece(s) 6 Day(s) or more 10100.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 478.90

1 Piece(s) 6 Day(s) or more 10110.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 521.10

1 Piece(s) 6 Day(s) or more 10120.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 563.28

1 Piece(s) 6 Day(s) or more 10130.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 605.47

1 Piece(s) 6 Day(s) or more 10140.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 647.67

1 Piece(s) 6 Day(s) or more 10150.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 689.85

1 Piece(s) 6 Day(s) or more 10160.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 732.04

1 Piece(s) 6 Day(s) or more 10170.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 774.23

1 Piece(s) 6 Day(s) or more 10180.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 816.42

1 Piece(s) 6 Day(s) or more 10190.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 858.62

1 Piece(s) 6 Day(s) or more 10200.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 900.80

1 Piece(s) 6 Day(s) or more 10210.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 942.99

1 Piece(s) 6 Day(s) or more 10220.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 985.18

1 Piece(s) 6 Day(s) or more 10230.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,027.37

1 Piece(s) 6 Day(s) or more 10240.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,069.55

1 Piece(s) 6 Day(s) or more 10250.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,111.75

1 Piece(s) 6 Day(s) or more 10260.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,153.93

1 Piece(s) 6 Day(s) or more 10270.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,196.13

1 Piece(s) 6 Day(s) or more 10280.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,238.32

1 Piece(s) 6 Day(s) or more 10290.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,280.50

1 Piece(s) 6 Day(s) or more 10300.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,322.70

1 Piece(s) 6 Day(s) or more 10310.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,364.88

1 Piece(s) 6 Day(s) or more 10320.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,407.08

1 Piece(s) 6 Day(s) or more 10330.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,449.26

1 Piece(s) 6 Day(s) or more 10340.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,491.45

1 Piece(s) 6 Day(s) or more 10350.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,533.65

1 Piece(s) 6 Day(s) or more 10360.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,575.83

1 Piece(s) 6 Day(s) or more 10370.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,618.02

1 Piece(s) 6 Day(s) or more 10380.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,660.21

1 Piece(s) 6 Day(s) or more 10390.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,702.40

1 Piece(s) 6 Day(s) or more 10400.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,744.59

1 Piece(s) 6 Day(s) or more 10410.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,786.78

1 Piece(s) 6 Day(s) or more 10420.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,828.96

1 Piece(s) 6 Day(s) or more 10430.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,871.16

1 Piece(s) 6 Day(s) or more 10440.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,913.35

1 Piece(s) 6 Day(s) or more 10450.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,955.53

1 Piece(s) 6 Day(s) or more 10460.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 1,997.73

1 Piece(s) 6 Day(s) or more 10470.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,039.91

1 Piece(s) 6 Day(s) or more 10480.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,082.11

1 Piece(s) 6 Day(s) or more 10490.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,124.30

1 Piece(s) 6 Day(s) or more 10500.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,166.48

1 Piece(s) 6 Day(s) or more 10510.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,208.68

1 Piece(s) 6 Day(s) or more 10520.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,250.86

1 Piece(s) 6 Day(s) or more 10530.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,293.05

1 Piece(s) 6 Day(s) or more 10540.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,335.24

1 Piece(s) 6 Day(s) or more 10550.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,377.43

1 Piece(s) 6 Day(s) or more 10560.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,419.63

1 Piece(s) 6 Day(s) or more 10570.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,461.81

1 Piece(s) 6 Day(s) or more 10580.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,504.00

1 Piece(s) 6 Day(s) or more 10590.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,546.19

1 Piece(s) 6 Day(s) or more 10600.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,588.38

1 Piece(s) 6 Day(s) or more 10610.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,630.56

1 Piece(s) 6 Day(s) or more 10620.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,672.76

1 Piece(s) 6 Day(s) or more 10630.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,714.94

1 Piece(s) 6 Day(s) or more 10640.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,757.14

1 Piece(s) 6 Day(s) or more 10650.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,799.33

1 Piece(s) 6 Day(s) or more 10660.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,841.51

1 Piece(s) 6 Day(s) or more 10670.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,883.71

1 Piece(s) 6 Day(s) or more 10680.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,925.89

1 Piece(s) 6 Day(s) or more 10690.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

MYR 2,968.09

1 Piece(s) 6 Day(s) or more 10700.2563P752.535793.2Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors

Loading...

Basic Information

Rated Voltage 300/300V Shield Tin plated copper braid Properties Oil Resistance
Representative Standard UL / CE / CSA(c-UL) Sheath (outer coating) color Gray Grounding Wire No grounding conductor
Sheath (outer coating) material Low adhesiveness PVC admixture Insulation body materials PP admixture Free span maximum running speed(m/s) 5
Slide maximum running speed(m/s) 3 Maximum acceleration(m/s2) 50 Stroke Up to 100 m
Other standards ISO class 1 (IPA): Clean room compatible/ CEI: Italian standard/ NFPA 79-2012: Used of UL (AWM) cable allowed Other cable properties Flame retardant and silicone free

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)