(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Kindly be informed that it will be peak period in conjunction with the Chinese New Year festive season. Delivery pickup upon 25 January 2025 estimated would arrive after CNY holidays. Please expect slight delay for orders shipped during this peak season and we thank you for your kind understanding. [Details]
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

NABEYA BI-TECH Manual XY-Axis Stages

Days to Ship
  • All
  • 1 Day(s) or Less
  • 2 Day(s) or Less
  • 4 Day(s) or Less
  • 5 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 12 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Load Capacity (Range Selectable)(N)
Table Size (Length) L (Range Selectable)(mm)
Table Size (Width) W (Range Selectable)(mm)
Stroke (Distance along X-Axis) (Range Selectable)(mm)
Stroke (Distance along Y-Axis) (Range Selectable)(mm)
Table Material
Feeding Method
Travel Guide
Table Size (Thickness) H (Range Selectable)(mm)
Table Surface Treatment

    Small XY-Axis Block Stage TAS

    Brand

    NABEYA BI-TECH

    Product Series

    Small XY-Axis Block Stage TAS

    CAD
    • 2D / 3D
    Days to Ship 8 Day(s) or more
    Load Capacity (Range Selectable)(N)5~30 / 30.1~50
    Table Size (Length) L (Range Selectable)(mm)~25 ~ 26~40
    Table Size (Width) W (Range Selectable)(mm)~25 ~ 26~40
    Stroke (Distance along X-Axis) (Range Selectable)(mm)Up to ±10mm
    Stroke (Distance along Y-Axis) (Range Selectable)(mm)Up to ±10mm
    Table MaterialBrass
    Feeding Method-
    Travel GuideDovetail Slide, Feed Screw
    Table Size (Thickness) H (Range Selectable)(mm)25.1~30
    Table Surface TreatmentLow Temperature Black Chrome Plating

    Loading...

    1. 1

    Related Categories to Manual XY-Axis Stages