(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Please note that some of the items may take longer lead time to ship due to Japan New Year holidays (29-Dec-2024 to 5-Jan-2025). Early order placement is recommended. We apologize for the inconvenience caused and appreciate your kind understanding. [Details]
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

NABEYA BI-TECH Manual XY-Axis Stages(Table Size (Thickness) H (Range Selectable):25.1~30)

Days to Ship
  • All
  • 1 Day(s) or Less
  • 2 Day(s) or Less
  • 4 Day(s) or Less
  • 5 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 12 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Load Capacity (Range Selectable)(N)
Table Size (Length) L (Range Selectable)(mm)
Table Size (Width) W (Range Selectable)(mm)
Stroke (Distance along X-Axis) (Range Selectable)(mm)
Stroke (Distance along Y-Axis) (Range Selectable)(mm)
Table Material
Feeding Method
Travel Guide
Table Size (Thickness) H (Range Selectable)(mm)
Table Surface Treatment

    Small XY-Axis Block Stage TAS

    Brand

    NABEYA BI-TECH

    Product Series

    Small XY-Axis Block Stage TAS

    CAD
    • 2D / 3D
    Days to Ship 8 Day(s) or more
    Load Capacity (Range Selectable)(N)5~30 / 30.1~50
    Table Size (Length) L (Range Selectable)(mm)~25 ~ 26~40
    Table Size (Width) W (Range Selectable)(mm)~25 ~ 26~40
    Stroke (Distance along X-Axis) (Range Selectable)(mm)Up to ±10mm
    Stroke (Distance along Y-Axis) (Range Selectable)(mm)Up to ±10mm
    Table MaterialBrass
    Feeding Method-
    Travel GuideDovetail Slide, Feed Screw
    Table Size (Thickness) H (Range Selectable)(mm)25.1~30
    Table Surface TreatmentLow Temperature Black Chrome Plating

    Loading...

    1. 1

    Related Categories to Manual XY-Axis Stages