(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 23/2 to 7:00 (MYT) 24/2/2025. We apologize for the inconvenience.
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

NICHIEIINTEC Level Bands(Surface Treatment:Zinc Plating)

Days to Ship
  • All
  • 4 Day(s) or Less
  • 5 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 13 Day(s) or Less
  1. 1
Brand
Product Series
Days to Ship
Type
Main Applicable Tube O.D.(mm)
Material
Applicable Tube Type
Surface Treatment

    Quick Level (Fire-Resistant Two-Layer Pipes)

      Quick Level (GP/VP)

        Urethane MS

        Brand

        NICHIEIINTEC

        NICHIEIINTEC

        NICHIEIINTEC

        Product Series

        Quick Level (Fire-Resistant Two-Layer Pipes)

        Quick Level (GP/VP)

        Urethane MS

        Days to Ship 9 Day(s) or more 5 Day(s) or more 9 Day(s) or more
        TypeFloor BandsFloor BandsAnti-vibration Brackets
        Main Applicable Tube O.D.(mm)60 ~ Less than 70 ~ 100 ~ Less than 20040 ~ Less than 50 ~ 100 ~ Less than 20020 ~ Less than 30 ~ 300 ~ Less than 400
        MaterialSteelSteelSteel
        Applicable Tube TypeFireproof Double-layer PipesSteel Tube / Vinyl Chloride TubeCopper Tube / Steel Tube
        Surface TreatmentZinc PlatingZinc PlatingZinc Plating

        Loading...

        1. 1

        Related Categories to Level Bands