(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Please note that some of the items may take longer lead time to ship due to Japan New Year holidays (29-Dec-2024 to 5-Jan-2025). Early order placement is recommended. We apologize for the inconvenience caused and appreciate your kind understanding. [Details]
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

SURUGA SEIKI Manual X-Axis Stages(Table Size (Thickness) H (Range Selectable):20.1~25)

Days to Ship
  • All
  • 1 Day(s) or Less
  • 2 Day(s) or Less
  • 4 Day(s) or Less
  • 5 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Stroke (Range Selectable)
Feeding Method
Table Size (Length) L (Range Selectable)(mm)
Load Capacity (Range Selectable)(N)
Table Size (Width) W (Range Selectable)(mm)
Table Size (Thickness) H (Range Selectable)(mm)
Travel Guide
Table Material
Table Surface Treatment
Product Category

    Dovetail Type Stage, Feed Screw Short Lead Type (B08/BDBXS/BDBXR)

    Brand

    SURUGA SEIKI

    Product Series

    Dovetail Type Stage, Feed Screw Short Lead Type (B08/BDBXS/BDBXR)

    CAD
    • 3D
    Days to Ship 4 Day(s) or more
    Stroke (Range Selectable)Up to ±10mm
    Feeding MethodFeed Screw
    Table Size (Length) L (Range Selectable)(mm)41~60
    Load Capacity (Range Selectable)(N)30.1~50
    Table Size (Width) W (Range Selectable)(mm)41~60
    Table Size (Thickness) H (Range Selectable)(mm)20.1~25
    Travel GuideDovetail Slide
    Table MaterialBrass
    Table Surface TreatmentBlack Oxide
    Product CategoryMain Body

    Loading...

    1. 1

    Related Categories to Manual X-Axis Stages