(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 9/2/2025 to 7:00 (MYT) 10/2/2025. We apologize for the inconvenience.
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

TOYO VALVE Gate Valves(Nominal Pressure:16K)

Days to Ship
  • All
  • 4 Day(s) or Less
  • 5 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 13 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Main Body Shape
Body Material
Applicable Fluid
Nominal Pressure
Gate Valve Type
Supply Side, Connection Type
Supply Side, Plumbing Thread Nominal
Supply Side, Tube Flange Nominal
Supply Side, Plumbing Pipe Dia.(φ)
Control Side, Connection Type
Control Side Plumbing Thread Nominal
Control Side, Tube Flange Nominal
Control Side, Plumbing Pipe Diameter(φ)
Handle Shape
Body Lining

    Gate Valve, 16K Type - Ductile Cast-Iron Flanged <Union Bonnet Type>

      Gate Valve, 16K Type Ductile Cast-Iron Screw-In <Union Bonnet Type>

        16K Type Ductile Cast-Iron Flanged Gate Valve <Bolted Bonnet Type>

        Brand

        TOYO VALVE

        TOYO VALVE

        TOYO VALVE

        Product Series

        Gate Valve, 16K Type - Ductile Cast-Iron Flanged

        Gate Valve, 16K Type Ductile Cast-Iron Screw-In

        16K Type Ductile Cast-Iron Flanged Gate Valve

        CAD
        • 2D
        • 2D
        • 2D
        Days to Ship 7 Day(s) or more 7 Day(s) or more 8 Day(s) or more
        Main Body ShapeStraightStraightStraight
        Body MaterialDuctile Cast IronDuctile Cast IronDuctile Cast Iron
        Applicable FluidWater / Air / Oil / Gas / SteamWater / Air / Oil / Gas / SteamWater / Air / Oil / Gas / Steam
        Nominal Pressure16K16K16K
        Gate Valve Type---
        Supply Side, Connection TypeTube FlangeRc(R)Tube Flange
        Supply Side, Plumbing Thread Nominal-1B ~ 3/4B-
        Supply Side, Tube Flange Nominal1B ~ 3/4B-2 1/2B ~ 4B
        Supply Side, Plumbing Pipe Dia.(φ)---
        Control Side, Connection TypeTube FlangeRc(R)Tube Flange
        Control Side Plumbing Thread Nominal-1B ~ 3/4B-
        Control Side, Tube Flange Nominal1B ~ 3/4B-2 1/2B ~ 4B
        Control Side, Plumbing Pipe Diameter(φ)---
        Handle ShapeRound HandleRound HandleRound Handle
        Body Lining---

        Loading...

        1. 1

        Related Categories to Gate Valves