(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (MYT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information. 
  • Please note that E-Invoice will be sent to our customers by email. For more information, please read News. 

Strap/Grip, G Type (Part Numbers)

Strap/Grip, G Type

Can be connected simply and safely as welding and threading are not required. Has earned a variety of certifications due to a long track record of performance. There are size limitations for products certified for fighting fires (for fire extinguishing equipment).

[Features]
Set includes a G type (G -32E to 150E) and a Stainless Steel SB Joint (elbow, tee, and reducer).
· An SB joint is formed by welding a single pipe to the neck part of a stainless steel butt-welded pipe fitting compliant with stainless steel pipe JIS G 3448 and SAS 354 for general piping using an automatic welding device.

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
G-20ESC
G-20FESS
G-20NSC
G-20NSS
G-25ESC
G-25ESS
G-25FESS
G-25NSC
G-25NSS
G-32ESC
G-32ESS
G-32FESS
G-32NSC
G-32NSS
G-40ESC
G-40ESS
G-40FESS
G-40NSC
G-40NSS
G-50ESC
G-50FESS
G-50NSC
G-50NSS
G-65ESC
G-65ESS
G-65FESS
G-65NSC
G-65NSS
G-80ESC
G-80ESS
G-80FESS
G-80NSC
G-80NSS
G-100ESC
G-100ESS
G-100FESS
G-100NSC
G-100NSS
G-125ESC
G-125ESS
G-125FESS
G-125NSC
G-125NSS
G-150ESC
G-150ESS
G-150FESS
G-150NSC
G-150NSS
G-200ESC
G-200ESS
G-200FESS
G-200NSC
G-200NSS
G-250ESS
G-250NSS
G-300ESS
G-300NSS
G-350ESS
G-350NSS
G-400ESS
G-400NSS
GB-20ESS
GB-20NSS
GB-25ESS
GB-25NSS
GB-32ESS
GB-32NSS
GB-40ESS
GB-40NSS
GB-50ESS
GB-50NSS
GB-65ESS
GB-65NSS
GB-80ESS
GB-80NSS
GB-100ESS
GB-100NSS
GB-125ESS
GB-125NSS
GB-150ESS
GB-150NSS
GB-200ESS
GB-200NSS
GB-250ESS
GB-250NSS
GB-300ESS
GB-300NSS
GB-350ESS
GB-350NSS
GB-400ESS
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipApplicable Plumbing Applicable Fluid Nominal Diameter Maximum Pressure Gas used [There are limites in the usage condition]
(MPa)
Rubber Sleeve Material Material of Bolt Inner Plate Fire-certified Products (For fire extinguishing equipment)

MYR 357.53

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical20A2EPDMBlack Harpoon SteelNoStandard

MYR 402.77

1 Piece(s) 7 Day(s) or more Steel pipeWater / Air / Chemical20A2EPDMStainless SteelNoCertified Products

MYR 357.53

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats20A2NBRBlack Harpoon SteelNoStandard

MYR 357.53

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats20A2NBRStainless SteelNoStandard

MYR 366.93

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical25A2EPDMBlack Harpoon SteelNoStandard

MYR 375.85

1 Piece(s) 4 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical25A2EPDMStainless SteelNoStandard

MYR 412.85

1 Piece(s) 7 Day(s) or more Steel pipeWater / Air / Chemical25A2EPDMStainless SteelNoCertified Products

MYR 366.93

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats25A2NBRBlack Harpoon SteelNoStandard

MYR 366.93

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats25A2NBRStainless SteelNoStandard

MYR 390.71

1 Piece(s) 14 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical32A2EPDMBlack Harpoon SteelNoStandard

MYR 381.47

1 Piece(s) 4 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical32A2EPDMStainless SteelNoStandard

MYR 437.97

1 Piece(s) 7 Day(s) or more Steel pipeWater / Air / Chemical32A2EPDMStainless SteelNoCertified Products

MYR 390.71

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats32A2NBRBlack Harpoon SteelNoStandard

MYR 390.71

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats32A2NBRStainless SteelNoStandard

MYR 400.42

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical40A2EPDMBlack Harpoon SteelNoStandard

MYR 387.09

1 Piece(s) 4 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical40A2EPDMStainless SteelNoStandard

MYR 448.36

1 Piece(s) 7 Day(s) or more Steel pipe / PVC PipeWater / Air / Chemical40A2EPDMStainless SteelNoCertified Products

MYR 400.42

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats40A2NBRBlack Harpoon SteelNoStandard

MYR 400.42

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats40A2NBRStainless SteelNoStandard

MYR 431.08

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical50A2EPDMBlack Harpoon SteelNoStandard

MYR 480.71

1 Piece(s) 7 Day(s) or more Steel pipe / PVC PipeWater / Air / Chemical50A2EPDMStainless SteelNoCertified Products

MYR 431.08

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats50A2NBRBlack Harpoon SteelNoStandard

MYR 431.08

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats50A2NBRStainless SteelNoStandard

MYR 525.35

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical65A2EPDMBlack Harpoon SteelNoStandard

MYR 505.09

1 Piece(s) 5 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical65A2EPDMStainless SteelNoStandard

MYR 584.10

1 Piece(s) 7 Day(s) or more Steel pipe / PVC PipeWater / Air / Chemical65A2EPDMStainless SteelNoCertified Products

MYR 525.35

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats65A2NBRBlack Harpoon SteelNoStandard

MYR 525.35

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats65A2NBRStainless SteelNoStandard

MYR 569.24

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical80A2EPDMBlack Harpoon SteelNoStandard

MYR 561.28

1 Piece(s) 6 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical80A2EPDMStainless SteelNoStandard

MYR 631.36

1 Piece(s) 7 Day(s) or more Steel pipe / PVC PipeWater / Air / Chemical80A2EPDMStainless SteelNoCertified Products

MYR 569.24

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats80A2NBRBlack Harpoon SteelNoStandard

MYR 569.24

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats80A2NBRStainless SteelNoStandard

MYR 621.92

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical100A2EPDMBlack Harpoon SteelNoStandard

MYR 574.65

1 Piece(s) 5 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical100A2EPDMStainless SteelNoStandard

MYR 688.09

1 Piece(s) 7 Day(s) or more Steel pipe / PVC PipeWater / Air / Chemical100A2EPDMStainless SteelNoCertified Products

MYR 621.92

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats100A2NBRBlack Harpoon SteelNoStandard

MYR 621.92

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats100A2NBRStainless SteelNoStandard

MYR 955.54

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical125A2EPDMBlack Harpoon SteelNoStandard

MYR 882.62

1 Piece(s) 6 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical125A2EPDMStainless SteelNoStandard

MYR 1,047.37

1 Piece(s) 7 Day(s) or more Steel pipe / PVC PipeWater / Air / Chemical125A2EPDMStainless SteelNoCertified Products

MYR 955.54

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats125A2NBRBlack Harpoon SteelNoStandard

MYR 955.54

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats125A2NBRStainless SteelNoStandard

MYR 1,148.66

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical150A2EPDMBlack Harpoon SteelNoStandard

MYR 1,060.88

1 Piece(s) 6 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical150A2EPDMStainless SteelNoStandard

MYR 1,255.34

1 Piece(s) 7 Day(s) or more Steel pipe / PVC PipeWater / Air / Chemical150A2EPDMStainless SteelNoCertified Products

MYR 1,148.66

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats150A2NBRBlack Harpoon SteelNoStandard

MYR 1,148.66

1 Piece(s) 9 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats150A2NBRStainless SteelNoStandard

MYR 2,348.19

1 Piece(s) 8 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical200A1.6EPDMBlack Harpoon SteelNoStandard

MYR 2,348.19

1 Piece(s) 6 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical200A1.6EPDMStainless SteelNoStandard

MYR 2,860.87

1 Piece(s) 7 Day(s) or more Steel pipe / PVC PipeWater / Air / Chemical200A1.6EPDMStainless SteelNoCertified Products

MYR 2,348.19

1 Piece(s) 8 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats200A1.6NBRBlack Harpoon SteelNoStandard

MYR 2,348.19

1 Piece(s) 6 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats200A1.6NBRStainless SteelNoStandard

MYR 3,657.47

1 Piece(s) 6 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical250A1.6EPDMStainless SteelNoStandard

MYR 3,657.47

1 Piece(s) 6 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats250A1.6NBRStainless SteelNoStandard

MYR 4,173.25

1 Piece(s) 6 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical300A1.4EPDMStainless SteelNoStandard

MYR 4,173.25

1 Piece(s) 6 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats300A1.4NBRStainless SteelNoStandard

MYR 4,720.72

1 Piece(s) 6 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical350A1.2EPDMStainless SteelNoStandard

MYR 4,720.72

1 Piece(s) 6 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats350A1.2NBRStainless SteelNoStandard

MYR 5,363.41

1 Piece(s) 6 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical400A1.0EPDMStainless SteelNoStandard

MYR 5,363.41

1 Piece(s) 6 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats400A1.0NBRStainless SteelNoStandard

MYR 371.72

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical20A2EPDMStainless SteelEquipped ProductsStandard

MYR 371.72

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats20A2NBRStainless SteelEquipped ProductsStandard

MYR 384.89

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical25A2EPDMStainless SteelEquipped ProductsStandard

MYR 384.89

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats25A2NBRStainless SteelEquipped ProductsStandard

MYR 404.65

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical32A2EPDMStainless SteelEquipped ProductsStandard

MYR 404.65

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats32A2NBRStainless SteelEquipped ProductsStandard

MYR 415.61

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical40A2EPDMStainless SteelEquipped ProductsStandard

MYR 415.61

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats40A2NBRStainless SteelEquipped ProductsStandard

MYR 439.75

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical50A2EPDMStainless SteelEquipped ProductsStandard

MYR 439.75

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats50A2NBRStainless SteelEquipped ProductsStandard

MYR 560.45

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical65A2EPDMStainless SteelEquipped ProductsStandard

MYR 560.45

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats65A2NBRStainless SteelEquipped ProductsStandard

MYR 606.53

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical80A2EPDMStainless SteelEquipped ProductsStandard

MYR 606.53

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats80A2NBRStainless SteelEquipped ProductsStandard

MYR 665.78

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical100A2EPDMStainless SteelEquipped ProductsStandard

MYR 665.78

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats100A2NBRStainless SteelEquipped ProductsStandard

MYR 1,003.73

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical125A2EPDMStainless SteelEquipped ProductsStandard

MYR 1,003.73

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats125A2NBRStainless SteelEquipped ProductsStandard

MYR 1,199.05

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical150A2EPDMStainless SteelEquipped ProductsStandard

MYR 1,199.05

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats150A2NBRStainless SteelEquipped ProductsStandard

MYR 2,671.06

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical200A1.6EPDMStainless SteelEquipped ProductsStandard

MYR 2,671.06

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats200A1.6NBRStainless SteelEquipped ProductsStandard

MYR 5,394.28

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical250A1.6EPDMStainless SteelEquipped ProductsStandard

MYR 5,394.28

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats250A1.6NBRStainless SteelEquipped ProductsStandard

MYR 6,237.14

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical300A1.4EPDMStainless SteelEquipped ProductsStandard

MYR 6,237.14

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats300A1.4NBRStainless SteelEquipped ProductsStandard

MYR 7,837.44

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical350A1.2EPDMStainless SteelEquipped ProductsStandard

MYR 7,837.44

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats350A1.2NBRStainless SteelEquipped ProductsStandard

MYR 8,900.56

1 Piece(s) 16 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical400A1.0EPDMStainless SteelEquipped ProductsStandard

Loading...

Basic Information

Type Joint Casing Material SUS304 Tightening Bolt Type Hexagon socket head bolt

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)